Barracuda P-43 FPSO
Revision as of 16:38, 30 July 2024 by Abarrelfull (talk | contribs)
Contents
Summary Information
- Name: Barracuda P 43 FPSO
- Field: Barracuda Oil Field
- Country: Brazil
- Ownership: Petrobras
- Website:
- Field Operated By: Petrobras
- Capacity: 150,000 bpd
- Year of Completion:
Brief Description
- The vessel has capacity to produce 150,000 barrels per day of oil plus gas compression capacity of 6 million m3/d. It is equipped with water injection capacity of 40,000 m3/d and can accommodate 100 personnel offshore.
- The P-43 project involved the conversion of the 270,000 dwt VLCC Stena Continent
Contractors
- KBR: Lump Sum EPC contract
- Jurong Shipyard:
- FPSO conversion
- Fabrication of topside production modules
- Integration of the Barracuda topside production modules with its newly-converted hull
- ABB: Electrical Systems
- Jotun: Painting
Status
- In operation
History
- 2001 - Jurong Shipyard secured the FPSO conversion project
- 2005 - Production began
Other Information
- -