Difference between revisions of "Hazira LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Hazira LNG, (Shell / Total) Website: http://www.haziralng.com/ List of Shell LNG Terminals Location: Hazira, Gujarat, India Capacity: 2.5 millio...") |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
| − | Summary Information | + | +++ Summary Information |
| − | Ownership: Hazira LNG, (Shell / Total) | + | |
| − | Website: http://www.haziralng.com/ | + | * Ownership: Hazira LNG, (Shell / Total) |
| − | List of Shell LNG Terminals | + | * Website: http://www.haziralng.com/ |
| − | Location: Hazira, Gujarat, India | + | * List of [[[Shell LNG Terminals]]] |
| − | Capacity: 2.5 million tons/annum | + | * Location: Hazira, Gujarat, India |
| − | Status: In Operation | + | * Capacity: 2.5 million tons/annum |
| − | Brief Description | + | * Status: In Operation |
| − | Hazira LNG Terminal is designed as a 5 million ton import terminal | + | |
| − | It is a merchant terminal, depending on short term contracts rather than long term agreements, making its sourcing more flexible | + | +++ Brief Description |
| − | Technical Details | + | * Hazira LNG Terminal is designed as a 5 million ton import terminal |
| − | Storage capacity: Two cryogenic tanks each with a net capacity of 160,000 m3 each | + | * It is a merchant terminal, depending on short term contracts rather than long term agreements, making its sourcing more flexible |
| − | Unloading capacity: | + | |
| − | Send out capacity: | + | +++ Technical Details |
| − | Constructor: | + | * Storage capacity: Two cryogenic tanks each with a net capacity of 160,000 m3 each |
| − | Designed by Shell Global Solutions (SGSI) | + | * Unloading capacity: |
| − | Managing Contractors – SN Technigaz/Bouygues Offshore Technimont ICB (French – Italian Consortium) | + | * Send out capacity: |
| − | Tanks – Punj Lloyd Limited | + | * Constructor: |
| − | Causeway and spurs – Larsen &Toubro Jetty - | + | ** Designed by Shell Global Solutions (SGSI) |
| − | Afcons Civil Building – Simplex | + | ** Managing Contractors – SN Technigaz/Bouygues Offshore Technimont ICB (French – Italian Consortium) |
| − | Tractebel Engineering: Executing FEED, EPC ITB & selection of EPC Contractor and Owner's Engineering services for the expansion | + | ** Tanks – Punj Lloyd Limited |
| − | Ongoing Projects/Project Status | + | ** Causeway and spurs – Larsen &Toubro Jetty - |
| − | The project is designed to be expandable to 5 million tons capacity | + | ** Afcons Civil Building – Simplex |
| − | It is currently undergoing expansion which will be completed in 2012 | + | ** **Tractebel Engineering:** Executing FEED, EPC ITB & selection of EPC Contractor and Owner's Engineering services for the expansion |
| − | In addition, there is potential to expanded to 10 million tons | + | |
| − | Suppliers / Customers | + | |
| − | Suppliers: Suppliers include the North-West Shelf LNG in Australia, and spot cargoes | + | +++ Ongoing Projects/Project Status |
| − | Customers: Connected to the local grid, to serve both industrial and domestic customers. | + | * The project is designed to be expandable to 5 million tons capacity |
| − | History | + | * It is currently undergoing expansion which will be completed in 2012 |
| − | 2005 - Terminal commences operations | + | * In addition, there is potential to expanded to 10 million tons |
| − | 2011 - The terminal recieves the first cargo from Qatargas 4 | + | |
| − | Other Information | + | +++ Suppliers / Customers |
| − | - | + | * Suppliers: Suppliers include the [[North-West Shelf LNG]] in Australia, and spot cargoes |
| − | Relevant Links | + | * Customers: Connected to the local grid, to serve both industrial and domestic customers. |
| − | Information from Shell | + | |
| − | Shell venture sells first regasified LNG from Hazira terminal in India | + | |
| − | Shell, Total To Expand India LNG Terminal Capacity In 2012 | + | +++ History |
| − | Tractebel Engineering LNG References | + | * 2005 - Terminal commences operations |
| − | Saipem LNG References | + | * 2011 - The terminal recieves the first cargo from [[Qatargas 4 Ras Laffan Lng Terminal | Qatargas 4]] |
| − | Qatargas and Shell send first Qatargas 4 cargo to India | + | |
| + | +++ Other Information | ||
| + | * - | ||
| + | |||
| + | +++ Relevant Links | ||
| + | # [http://www.shell.com/home/content/ind/aboutshell/shell_businesses/india_business_structure/hazira_lng/ Information from Shell] | ||
| + | # [http://www.shell.com/home/content/media/news_and_media_releases/archive/2005/lng_from_hazira_21042005.html Shell venture sells first regasified LNG from Hazira terminal in India] | ||
| + | # [http://www.foxbusiness.com/industries/2011/11/03/shell-total-to-expand-india-lng-terminal-capacity-in-2012/ Shell, Total To Expand India LNG Terminal Capacity In 2012] | ||
| + | # [[Tractebel Engineering LNG References]] | ||
| + | # [[Saipem LNG References]] | ||
| + | # [http://killajoules.wikidot.com/blog:546 Qatargas and Shell send first Qatargas 4 cargo to India] | ||
Revision as of 15:59, 28 January 2026
+++ Summary Information
- Ownership: Hazira LNG, (Shell / Total)
- Website: http://www.haziralng.com/
* List of [[[Shell LNG Terminals]]]
- Location: Hazira, Gujarat, India
- Capacity: 2.5 million tons/annum
- Status: In Operation
+++ Brief Description
- Hazira LNG Terminal is designed as a 5 million ton import terminal
- It is a merchant terminal, depending on short term contracts rather than long term agreements, making its sourcing more flexible
+++ Technical Details
- Storage capacity: Two cryogenic tanks each with a net capacity of 160,000 m3 each
- Unloading capacity:
- Send out capacity:
- Constructor:
- Designed by Shell Global Solutions (SGSI)
- Managing Contractors – SN Technigaz/Bouygues Offshore Technimont ICB (French – Italian Consortium)
- Tanks – Punj Lloyd Limited
- Causeway and spurs – Larsen &Toubro Jetty -
- Afcons Civil Building – Simplex
- **Tractebel Engineering:** Executing FEED, EPC ITB & selection of EPC Contractor and Owner's Engineering services for the expansion
+++ Ongoing Projects/Project Status
- The project is designed to be expandable to 5 million tons capacity
- It is currently undergoing expansion which will be completed in 2012
- In addition, there is potential to expanded to 10 million tons
+++ Suppliers / Customers
- Suppliers: Suppliers include the North-West Shelf LNG in Australia, and spot cargoes
- Customers: Connected to the local grid, to serve both industrial and domestic customers.
+++ History
- 2005 - Terminal commences operations
- 2011 - The terminal recieves the first cargo from Qatargas 4
+++ Other Information
- -
+++ Relevant Links