Difference between revisions of "Nord-West Oelleitung Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 32: | Line 32: | ||
# [https://nwowhv.de/en/facts-and-figures/ NWO, Facts and Figures] | # [https://nwowhv.de/en/facts-and-figures/ NWO, Facts and Figures] | ||
+ | # [https://refiningnews.blogspot.com/2025/03/bp-europa-se-to-seek-potential-buyers.html BP Europa SE to seek potential buyers for Ruhr Oel GmbH – BP Gelsenkirchen] | ||
+ | |||
+ | [[category:Pipeline]] | ||
+ | [[category:Germany]] |
Revision as of 16:29, 13 March 2025
Summary Information
- Source: Wilhelmshaven
- Destination: Köln
- Ownership: Nord West Oelleitung Gmbh
- Website: https://nwowhv.de/en/home/
- Length: 391 kilometres ( miles)
- Capacity: 320,000 barrels of oil per day
- Crude Type:
The Route
- NWO’s pipeline measures 28 inches in diameter and is 391 km long with its branch pipelines included.
- The pipeline source is a tank farm in Wilhelmshaven, on the Baltic coast.
- The pipeline runs from North to South, bringing crude oil to refineries in the West of Germany.
- Refineries supplied by the pipeline are:
Pipeline Status
- In operation
History
- 1956 - Company formed
- 1958 - Pipeline commissioned