Difference between revisions of "Bonga Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Shell * Country: Nigeria * Location: OML 118, 120 km off coast of the Niger Delta * Production start: 2005 * Partners: NNPC, Total, Eni * Type...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Shell | * Operator: Shell | ||
* Country: Nigeria | * Country: Nigeria | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* This was the first deepwater project for Shell in Nigeria in a water depth of 3,000 ft located 120 km off coast of the Niger Delta using a FPSO | * This was the first deepwater project for Shell in Nigeria in a water depth of 3,000 ft located 120 km off coast of the Niger Delta using a FPSO | ||
− | * The FPSO, measures over 300 metres long, 75 metres wide and 33 metres tall. The | + | * The FPSO, measures over 300 metres long, 75 metres wide and 33 metres tall. The [[Bonga FPSO]] can extract and process up to 225,000 barrels of oil a day and store up to 2 million barrels of oil. It also has a gas export facility of 150 million standard cubic feet per day |
* Bonga North-West is located in approximately 900 to 1,200 meters of water, and has been developed with 12 subsea wells tied back into the Bonga main infrastructure. | * Bonga North-West is located in approximately 900 to 1,200 meters of water, and has been developed with 12 subsea wells tied back into the Bonga main infrastructure. | ||
* Bonga Phase 3 is an expansion of the Bonga Main development, with peak production expected to be some 50,000 barrels of oil equivalent. This is transported through existing pipelines to the [[Bonga FPSO]] | * Bonga Phase 3 is an expansion of the Bonga Main development, with peak production expected to be some 50,000 barrels of oil equivalent. This is transported through existing pipelines to the [[Bonga FPSO]] | ||
+ | * Bonga North will be a subsea tie-back to the [[Bonga FPSO]]. The Bonga North project involves drilling, completing, and starting up 16 wells (8 production and 8 water injection wells), modifications to the existing Bonga Main FPSO and the installation of new subsea hardware tied back to the FPSO. | ||
− | + | === Contractors === | |
* **AMEC:** FPSO Engineering Procurement Construction contract | * **AMEC:** FPSO Engineering Procurement Construction contract | ||
* **Samsung Heavy Industries(SHI):** FPSO hull construction | * **Samsung Heavy Industries(SHI):** FPSO hull construction | ||
Line 23: | Line 24: | ||
* **Manatee:** Production equipment design, flowlines, manifold, steel catenary risers, trees and controls, flow assurance peer review, operating guidelines and training, and cost control. | * **Manatee:** Production equipment design, flowlines, manifold, steel catenary risers, trees and controls, flow assurance peer review, operating guidelines and training, and cost control. | ||
* **J P Kenny:** Preparation of Field Development Plan | * **J P Kenny:** Preparation of Field Development Plan | ||
+ | ==== Bonga North ==== | ||
− | + | === History === | |
* 1995 - Bonga Oil And Gas Field discovered | * 1995 - Bonga Oil And Gas Field discovered | ||
* 2002 - FPSO Bonga leaves SHI yard in Korea | * 2002 - FPSO Bonga leaves SHI yard in Korea | ||
Line 33: | Line 35: | ||
* 2014 - First oil produced from Bonga North West | * 2014 - First oil produced from Bonga North West | ||
* 2015 - Production starts from Bonga Phase 3 | * 2015 - Production starts from Bonga Phase 3 | ||
+ | * | ||
+ | * 2024 - Bonga North project launched | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[Manatee Offshore References]] | # [[Manatee Offshore References]] | ||
# [[Aker Solutions Umbilical References]] | # [[Aker Solutions Umbilical References]] | ||
Line 48: | Line 52: | ||
# [http://killajoules.wikidot.com/blog:5342 First oil produced from SNEPCO-operated Bonga North West deep-water project in Nigeria] | # [http://killajoules.wikidot.com/blog:5342 First oil produced from SNEPCO-operated Bonga North West deep-water project in Nigeria] | ||
# [http://killajoules.wikidot.com/blog:6049 Shell commences production from Bonga Phase 3 project in Nigeria] | # [http://killajoules.wikidot.com/blog:6049 Shell commences production from Bonga Phase 3 project in Nigeria] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Nigeria]] | ||
+ | [[category:Shell]] |
Revision as of 16:55, 28 December 2024
Contents
Summary Information
- Operator: Shell
- Country: Nigeria
- Location: OML 118, 120 km off coast of the Niger Delta
- Production start: 2005
- Partners: NNPC, Total, Eni
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- This was the first deepwater project for Shell in Nigeria in a water depth of 3,000 ft located 120 km off coast of the Niger Delta using a FPSO
- The FPSO, measures over 300 metres long, 75 metres wide and 33 metres tall. The Bonga FPSO can extract and process up to 225,000 barrels of oil a day and store up to 2 million barrels of oil. It also has a gas export facility of 150 million standard cubic feet per day
- Bonga North-West is located in approximately 900 to 1,200 meters of water, and has been developed with 12 subsea wells tied back into the Bonga main infrastructure.
- Bonga Phase 3 is an expansion of the Bonga Main development, with peak production expected to be some 50,000 barrels of oil equivalent. This is transported through existing pipelines to the Bonga FPSO
- Bonga North will be a subsea tie-back to the Bonga FPSO. The Bonga North project involves drilling, completing, and starting up 16 wells (8 production and 8 water injection wells), modifications to the existing Bonga Main FPSO and the installation of new subsea hardware tied back to the FPSO.
Contractors
- **AMEC:** FPSO Engineering Procurement Construction contract
- **Samsung Heavy Industries(SHI):** FPSO hull construction
- **Saipem:** Engineering, procurement, fabrication, installation and pre-commissioning services for 13 kilometres of 10”/12” production pipe-in-pipe flowlines, 4 kilometres of 12” water injection flowlines as well as related production facilities for Bonga North-West
- **Subsea 7:** Eight production flowlines, 10-inch, 26km total length, with six Steel Catenary Risers (SCRs) each 2km in length, two production flowlines, 12-inch, 12km total length, with two SCRs each 2km in length. In addition, a total of 24km of 12-inch water injection flowlines with 2km long SCRs transport treated seawater from the FPSO to several subsea injection wells.
- Aker Solutions: 72 km of Umbilicals
- **Manatee:** Production equipment design, flowlines, manifold, steel catenary risers, trees and controls, flow assurance peer review, operating guidelines and training, and cost control.
- **J P Kenny:** Preparation of Field Development Plan
Bonga North
History
- 1995 - Bonga Oil And Gas Field discovered
- 2002 - FPSO Bonga leaves SHI yard in Korea
- 2003 - The Bonga FPSO sets sail for Nigeria
- 2005 - Bonga field came on stream
- 2009 - Saipem awarded Bonga North-West contract
- 2011 - Temporary shut down due to leak
- 2014 - First oil produced from Bonga North West
- 2015 - Production starts from Bonga Phase 3
- 2024 - Bonga North project launched
Geology
Links
- Manatee Offshore References
- Aker Solutions Umbilical References
- J P Kenny Subsea References
- Saipem wins a new offshore contract in Nigeria worth over US$ 200 million
- Nigerian Bound Bonga Hailed a Major Success for AMEC
- SHI constructs world's largest FPSO facility
- Shell Bonga Field Development, Subsea 7
- Shell Nigeria temporarily shuts in Bonga field in response to oil leak
- First oil produced from SNEPCO-operated Bonga North West deep-water project in Nigeria
- Shell commences production from Bonga Phase 3 project in Nigeria