Difference between revisions of "Borger Express Crude Oil Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 25: | Line 25: | ||
=== Links === | === Links === | ||
+ | # [[EIA Liquids Pipeline Projects 2021-2025]] | ||
# [https://abarrelfull.blogspot.com/2024/11/navigator-launches-binding-open-season.html Navigator Launches Binding Open Season for Its Borger Express Pipeline System] | # [https://abarrelfull.blogspot.com/2024/11/navigator-launches-binding-open-season.html Navigator Launches Binding Open Season for Its Borger Express Pipeline System] | ||
Revision as of 16:06, 3 November 2024
Contents
Summary Information
- Source:
- Destination:
- Ownership:
- Website:
- Length: kilometres ( miles)
- Capacity: barrels of oil per day
- Crude Type:
Brief Description
- The Borger Express pipeline will provide the new services by utilizing approximately 180 miles of an existing crude oil pipeline, and constructing nearly 200 miles of new, 16-inch diameter pipeline from Cleo Springs, Oklahoma to Borger. The project will provide shippers with critical transportation services for numerous grades of light and heavy crude oil from the Cushing storage hub to third party storage and the Borger Refinery
Pipeline Status
- In operation
History
- 2020 - Navigator Launches Binding Open Season
Other Information
- -