Difference between revisions of "Jubarte Oil Field"

From A Barrel Full
Jump to navigation Jump to search
Line 12: Line 12:
 
* The field consist of both a large conventional reservoir as well a Pre-Salt  
 
* The field consist of both a large conventional reservoir as well a Pre-Salt  
 
* It is produced using the [[P-57 FPSO]], which is capable of producing 180,000 bopd and undertake gas compression of 71 million cubic feet of gas per day (mmscf/d)
 
* It is produced using the [[P-57 FPSO]], which is capable of producing 180,000 bopd and undertake gas compression of 71 million cubic feet of gas per day (mmscf/d)
* The pre-salt reservoir is produced via the [[Cidade De Anchieta FPSO]]
+
* The pre-salt reservoir is produced via the [[Cidade De Anchieta FPSO]] and the [[Maria Quitéria FPSO]]
 
* Gas is transported on the [[Sul-Norte Capixaba Gas Pipeline]], to the onshore [[Cacimbas Gas Treatment Unit (UTGC)]]
 
* Gas is transported on the [[Sul-Norte Capixaba Gas Pipeline]], to the onshore [[Cacimbas Gas Treatment Unit (UTGC)]]
 
* Jubarte means Humpback
 
* Jubarte means Humpback
Line 33: Line 33:
 
* 2012 - A small leak occurred on the platform
 
* 2012 - A small leak occurred on the platform
 
* 2012 - Production starts on Cidade De Anchieta FPSO
 
* 2012 - Production starts on Cidade De Anchieta FPSO
 +
* 2024 - Production starts on Maria Quitéria FPSO
  
 
+++ Geology
 
+++ Geology
Line 46: Line 47:
 
# [http://killajoules.wikidot.com/archive:existence-of-an-oil-slick-in-the-jubarte-field Existence of an oil slick in the Jubarte field]
 
# [http://killajoules.wikidot.com/archive:existence-of-an-oil-slick-in-the-jubarte-field Existence of an oil slick in the Jubarte field]
 
# [http://killajoules.wikidot.com/archive:sbm-offshore-commencement-of-production-on-fpso-cida SBM Offshore - Commencement Of Production On FPSO Cidade De Anchieta]
 
# [http://killajoules.wikidot.com/archive:sbm-offshore-commencement-of-production-on-fpso-cida SBM Offshore - Commencement Of Production On FPSO Cidade De Anchieta]
 +
# [https://a-barrel-full.blogspot.com/2024/10/fpso-maria-quiteria-starts-operating-in.html FPSO Maria Quitéria starts operating in the pre-salt Campos Basin]

Revision as of 16:50, 31 October 2024

Summary Information

  • Operator: Petrobras
  • Country: Brazil
  • Location: Campos Basin
  • Production start: 2008
  • Partners:
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

+++ Contractors

  • **Keppel:** FPSO - hull and marine conversion, spread mooring aids installation, accommodation block extensions/refurbishment, fabrication & installation of marine pipe rack, topside module supports as well as part of the topside modules installation
  • **Aker:**
    • Eight subsea boosting systems, including power distribution, vertical connection modules, tools, accessories and spares
    • Eight subsea boosting systems (Mobo) and one ESDV (emergency valve)
  • **Oceaneering:** A hybrid, multi-phase, mud line, pump umbilical including electrical conductors
  • **PGS:** Permanent seismic monitoring system

+++ History

  • 2001 - Jubarte Oil Field discovered
  • 2005 - Oceaneering awarded Jubarte Field Pump Umbilical Contract
  • 2006 - Oil production started above the salt layer
  • 2008 - Production startup in the Pre-Salt Layer
  • 2008 - Keppel awarded FPSO conversion contract
  • 2010 - PGS awarded contract to install a permanent seismic monitoring system
  • 2012 - A small leak occurred on the platform
  • 2012 - Production starts on Cidade De Anchieta FPSO
  • 2024 - Production starts on Maria Quitéria FPSO

+++ Geology

+++ Links

  1. Oceaneering Announces Jubarte Field Pump Umbilical Contract
  2. Aker Kvaerner awarded subsea boosting systems contract for Petrobras
  3. Keppel Shipyard secures two conversion projects worth S$150 million
  4. Production startup in the Pre-Salt Layer
  5. Aker Solutions to supply subsea boosting systems to Petrobras
  6. Petrobras and PGS Sign Agreement to Perform Fiber-Optic Permanent Seismic Reservoir Monitoring in Brazil's Jubarte Field
  7. Existence of an oil slick in the Jubarte field
  8. SBM Offshore - Commencement Of Production On FPSO Cidade De Anchieta
  9. FPSO Maria Quitéria starts operating in the pre-salt Campos Basin