Difference between revisions of "Hawiyah Gas Processing Plant"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: Saudi Aramco * Website: * Location: 220 kilometers south of Dhahran * Capacity: 2.4 billion scfd +++ Brief Description * The plant was orig...") |
Abarrelfull (talk | contribs) |
||
Line 15: | Line 15: | ||
++++ Related Oil and Gas Fields | ++++ Related Oil and Gas Fields | ||
− | * | + | * [[Ghawar Oil Field]] |
+++ Ongoing Projects | +++ Ongoing Projects | ||
Line 28: | Line 28: | ||
+++ Relevant Links | +++ Relevant Links | ||
− | # [[ | + | # [[OTEPI Refinery References]] |
# [[JGC Oil And Gas Processing References]] | # [[JGC Oil And Gas Processing References]] | ||
# [[Saipem Acid Gas Removal References]] | # [[Saipem Acid Gas Removal References]] | ||
− | # [[ | + | # [[Technip Oil And Gas Processing References]] |
Latest revision as of 11:32, 16 August 2024
Summary Information
- Ownership: Saudi Aramco
- Website:
- Location: 220 kilometers south of Dhahran
- Capacity: 2.4 billion scfd
+++ Brief Description
- The plant was originally designed to process 1.6 billion standard cubic feet per day (scfd) of raw non-associated gas from wells in the [[[Ghawar Oil Field]]] and produce 1.4 billion scfd of sales gas and 170,000 bpd of condensate.
- The plant was the first company plant to process non-associated gas
+++ Contractors
- **Saipem:** Gas Treating and Compression Facilities at Hawiyah NGL Recovery Plant
- **JGC:** Gas Treating - 1,600 MMSCFD
++++ Related Oil and Gas Fields
+++ Ongoing Projects
- -
+++ Other Information
- -
+++ History
- 2001 - Operations started
- 2009 - Capacity increased from 1.6 billion to 2.4 billion scfd
+++ Relevant Links