Difference between revisions of "Gemini Gas and Condensate Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Chevron * Country: USA * Location: Mississippi Canyon Blocks 248, 291 & 292, Gulf of Mexico * Production start: 1999 * Partners: * Type: Gas...")
 
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 
* Operator: Chevron
 
* Operator: Chevron
 
* Country: USA  
 
* Country: USA  
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
  
 
* The production system consists of three wells tied into a subsea manifold, on the bottom of the Gulf of Mexico in 3,400 feet of water, flowing 27 miles via dual 12-inch flowlines to a processing platform in Viosca Knoll Block 900
 
* The production system consists of three wells tied into a subsea manifold, on the bottom of the Gulf of Mexico in 3,400 feet of water, flowing 27 miles via dual 12-inch flowlines to a processing platform in Viosca Knoll Block 900
  
+++ Contractors
+
=== Contractors ===
* **Nexans:** C/H Umbilical, Electrical Umbilical and Umbilical Installation
+
* '''Nexans:''' C/H Umbilical, Electrical Umbilical and Umbilical Installation
  
+++ History
+
=== History ===
 
* 1995 - Gemini Gas And Condensate Field discovered
 
* 1995 - Gemini Gas And Condensate Field discovered
 
* 1998 - Final investment decision taken
 
* 1998 - Final investment decision taken
 
* 1999 - First gas produced
 
* 1999 - First gas produced
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [[Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields]]
 
# [[Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields]]
 
# [[Nexans Norway Umbilical References]]
 
# [[Nexans Norway Umbilical References]]
 
# [http://killajoules.wikidot.com/archive:texaco-and-chevron-move-forward-with-185-million-dev Texaco and Chevron Move Forward with $185 Million Development]
 
# [http://killajoules.wikidot.com/archive:texaco-and-chevron-move-forward-with-185-million-dev Texaco and Chevron Move Forward with $185 Million Development]
 
# [http://killajoules.wikidot.com/archive:texaco-begins-production-from-gemini-in-deepwater-gu Texaco Begins Production From Gemini in Deepwater Gulf of Mexico]
 
# [http://killajoules.wikidot.com/archive:texaco-begins-production-from-gemini-in-deepwater-gu Texaco Begins Production From Gemini in Deepwater Gulf of Mexico]

Latest revision as of 16:57, 14 July 2024

Summary Information

  • Operator: Chevron
  • Country: USA
  • Location: Mississippi Canyon Blocks 248, 291 & 292, Gulf of Mexico
  • Production start: 1999
  • Partners:
  • Type: Gas & Condensate
  • Estimated Reserves:
  • Production Volume:

Description

  • The production system consists of three wells tied into a subsea manifold, on the bottom of the Gulf of Mexico in 3,400 feet of water, flowing 27 miles via dual 12-inch flowlines to a processing platform in Viosca Knoll Block 900

Contractors

  • Nexans: C/H Umbilical, Electrical Umbilical and Umbilical Installation

History

  • 1995 - Gemini Gas And Condensate Field discovered
  • 1998 - Final investment decision taken
  • 1999 - First gas produced

Geology

Links

  1. Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields
  2. Nexans Norway Umbilical References
  3. Texaco and Chevron Move Forward with $185 Million Development
  4. Texaco Begins Production From Gemini in Deepwater Gulf of Mexico