Difference between revisions of "West Sole Area Gas Fields"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   (→Links)  | 
				||
| Line 28: | Line 28: | ||
=== Links ===  | === Links ===  | ||
# [[UK Oil and Gas Fields by Approval Date]]  | # [[UK Oil and Gas Fields by Approval Date]]  | ||
| + | # [[List Of Oil and Gas Production Platforms In The UK]]  | ||
# [https://abarrelfull.blogspot.com/2024/06/bp-agrees-sale-of-southern-gas-assets.html BP agrees sale of southern gas assets to Perenco]  | # [https://abarrelfull.blogspot.com/2024/06/bp-agrees-sale-of-southern-gas-assets.html BP agrees sale of southern gas assets to Perenco]  | ||
Latest revision as of 07:11, 1 July 2024
Summary Information
- Operator: Perenco
 - Country: UK
 - Location: Southern North Sea
 - Production start:
 - Partners:
 - Type: Oil / Gas
 - Estimated Reserves:
 - Production Volume:
 
Description
- The West Sole Alpha platform consists of steel legged platforms, which includes process facilities and accommodation and receives gas and fluids from all of the associated tie-backs.
 - Processed gas and some fluids are routed to the onshore Dimlington Gas Terminal located on the Yorkshire coast via a 71.9 kilometre 16 inch diameter pipeline (PL28), through the West Sole Alpha platform through a 68 kilometre 24 inch diameter pipeline (PL145) and through the Amethyst A2D platform via a 47.7km 30 inch diameter pipeline (PL649).
 - Hyde, Hoton and Amethyst are tied back to the West Sole Hub
 
Contractors
- -
 
History
- 1967 - Approval granted for development
 - 1993 - Hyde Platform installed
 - 2001 - Approval granted for Hoton
 - 2012 - Perenco acquired the fields from BP