Difference between revisions of "Gryphon FPSO"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Name: Gryphon FPSO * Field: Gryphon Oil Field * Country: UK * Ownership: Total * Website: * Field Operated By: Total * Capacity: bpd * Year of Co...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Name: Gryphon FPSO
 
* Name: Gryphon FPSO
Line 8: Line 8:
 
* Field Operated By: Total
 
* Field Operated By: Total
 
* Capacity:  bpd  
 
* Capacity:  bpd  
* Year of Completion:  
+
* Year of Completion: 1993
  
+++ Brief Description
+
=== Brief Description ===
  
* The vessel is the longest serving permanently moored fpso in europe
+
* The vessel is the longest serving permanently moored FPSO in Europe
 +
* The FPSO is 258 metres long, 41 metres wide and 24 metres deep
 
* It is capable of storing 540,000 barrels of oil
 
* It is capable of storing 540,000 barrels of oil
 +
* Gas production is constrained by processing capacities at the Gryphon FPSO, currently limited to 47MMScf/d of gas handling (gas export, gas lift and re-injection) via three compression trains.
 +
* The glycol dehydration system has an installed capacity of 90MMScf/d (potential future gas expansion capacity).
 +
* Produced water facilities consists of treatment equipment (design rate of 110,000 bwpd) and reinjection
 +
equipment for reservoir pressure maintenance and disposal (design rate of 79,000bwpd).
 +
* Main power generation for normal operations is provided by two 8.5 MW gas turbine generators, with
 +
further power generation provided by up to five 3MW diesel driven generators, according to operational requirements. All five diesel generators are able to operate in parallel with the gas
 +
turbine generators
  
+++ Contractors
 
* **Astano:** Construction of FPSO hull
 
* **McNulty Offshore:** Construction of topsides
 
* **Aker:** Pusnes Offloading System
 
* **ABB:** Electrical Systems
 
  
+++ Status
+
=== Contractors ===
 +
* '''Astano:''' Construction of FPSO hull
 +
* '''McNulty Offshore:''' Construction of topsides
 +
* '''Aker:''' Pusnes Offloading System
 +
* '''ABB:''' Electrical Systems
 +
 
 +
=== Status ===
 
* In operation
 
* In operation
  
+++ History
+
=== History ===
 
* 1993 - Gryphon FPSO constructed
 
* 1993 - Gryphon FPSO constructed
 
* 2011 - The vessel was damaged in a storm
 
* 2011 - The vessel was damaged in a storm
Line 30: Line 39:
 
* 2017 - Total acquires Maersk and becomes operator
 
* 2017 - Total acquires Maersk and becomes operator
  
+++ Other Information
+
=== Other Information ===
  
 
* -
 
* -
  
+++ Links
+
=== Links ===
  
 
# [[List Of Oil Production Platforms In The UK]]
 
# [[List Of Oil Production Platforms In The UK]]

Revision as of 16:36, 30 June 2024

Summary Information

  • Name: Gryphon FPSO
  • Field: Gryphon Oil Field
  • Country: UK
  • Ownership: Total
  • Website:
  • Field Operated By: Total
  • Capacity: bpd
  • Year of Completion: 1993

Brief Description

  • The vessel is the longest serving permanently moored FPSO in Europe
  • The FPSO is 258 metres long, 41 metres wide and 24 metres deep
  • It is capable of storing 540,000 barrels of oil
  • Gas production is constrained by processing capacities at the Gryphon FPSO, currently limited to 47MMScf/d of gas handling (gas export, gas lift and re-injection) via three compression trains.
  • The glycol dehydration system has an installed capacity of 90MMScf/d (potential future gas expansion capacity).
  • Produced water facilities consists of treatment equipment (design rate of 110,000 bwpd) and reinjection

equipment for reservoir pressure maintenance and disposal (design rate of 79,000bwpd).

  • Main power generation for normal operations is provided by two 8.5 MW gas turbine generators, with

further power generation provided by up to five 3MW diesel driven generators, according to operational requirements. All five diesel generators are able to operate in parallel with the gas turbine generators


Contractors

  • Astano: Construction of FPSO hull
  • McNulty Offshore: Construction of topsides
  • Aker: Pusnes Offloading System
  • ABB: Electrical Systems

Status

  • In operation

History

  • 1993 - Gryphon FPSO constructed
  • 2011 - The vessel was damaged in a storm
  • 2013 - Production resumes following repairs
  • 2017 - Total acquires Maersk and becomes operator

Other Information

  • -

Links

  1. List Of Oil Production Platforms In The UK
  2. ABB FPSO References
  3. Aker FPSO Pusnes Offloading Systems
  4. Fact Sheet
  5. Maersk Oil’s Gryphon FPSO to be docked for repairs
  6. Maersk Oil UK Gryphon FPSO back in production
  7. Total acquires Maersk Oil for $7.45 billion in a share and debt transaction