Difference between revisions of "Silvertip Crude Oil Pipeline"

From A Barrel Full
Jump to navigation Jump to search
Line 12: Line 12:
  
 
* The Silvertip Pipeline is a 12-inch pipeline approximately 69 miles in length  
 
* The Silvertip Pipeline is a 12-inch pipeline approximately 69 miles in length  
* Receipt points include Cenex Front Range Pipeline, [[Glacier Crude Oil Pipeline]], Marathon Pipeline, and [[Express Oil Pipeline System]] at Edgar Station, Montana.  
+
* Receipt points include Cenex [[Front Range Oil Pipeline]], [[Glacier Crude Oil Pipeline]], Marathon Pipeline, and [[Express Oil Pipeline System]] at Edgar Station, Montana.  
* Deliveries are to Cenex at Laurel, Montana, and [[Exxonmobil Billings Refinery]], Montana.
+
* Deliveries are to Cenex at [[Laurel Refinery]], Montana, and [[Exxonmobil Billings Refinery]], Montana.
  
 
=== Pipeline Status ===
 
=== Pipeline Status ===

Revision as of 07:31, 10 June 2024

Summary Information

  • Source: Elk Basin, Wyoming
  • Destination: Billings, Montana
  • Ownership: Par Pacific
  • Website: https://www.parpacific.com/
  • Length: kilometres (69 miles)
  • Capacity: barrels of oil per day
  • Crude Type:

Brief Description

Pipeline Status

  • In operation

History

  • 2011 - 1,509 barrels of oil leaked during a flood
  • 2022 - Par Pacific acquired the pipeline from Exxon

Other Information

  • -

Links

  1. Statement by ExxonMobil Pipeline Company Regarding Crude Oil Release into Yellowstone River in Montana
  2. U.S. Department of Transportation Proposes $1.7 Million in Civil Penalties for ExxonMobil for Yellowstone River Pipeline Failure
  3. ExxonMobil to sell Billings refinery to Par Pacific Holdings