Difference between revisions of "ADCC Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Source: * Destination: * Ownership: * Website: * Length: kilometres ( miles) * Capacity: per day * Status: (Operating/Planned/Under Cons...")
 
Line 7: Line 7:
 
* Length:  kilometres ( miles)  
 
* Length:  kilometres ( miles)  
 
* Capacity: per day  
 
* Capacity: per day  
* Status: (Operating/Planned/Under Construction)
+
* Status: Planned
  
 
=== Details ===
 
=== Details ===
* -
+
* The project is a 40-mile, 42-inch proposed intrastate pipeline designed to transport 1.7 Bcf/d of natural gas from the terminus of the [[Whistler Gas Pipeline]] in Agua Dulce, TX to Cheniere's [[Corpus Christi LNG Terminal]]
  
 
=== History ===
 
=== History ===
* -  
+
* 2024 - Enbridge became a partner in the pipeline
  
 
=== Other Information ===
 
=== Other Information ===
Line 19: Line 19:
  
 
=== Links ===
 
=== Links ===
# []
+
# [https://abarrelfull.blogspot.com/2024/05/enbridge-to-enter-into-jv-connecting.html Enbridge to Enter into JV Connecting Permian Basin Natural Gas Supply to Growing LNG and USGC Demand]
  
 
[[category:Pipeline]]
 
[[category:Pipeline]]
 
[[category:Country]]
 
[[category:Country]]
 
[[category:Company]]
 
[[category:Company]]

Revision as of 10:03, 13 May 2024

Summary Information

  • Source:
  • Destination:
  • Ownership:
  • Website:
  • Length: kilometres ( miles)
  • Capacity: per day
  • Status: Planned

Details

History

  • 2024 - Enbridge became a partner in the pipeline

Other Information

  • -

Links

  1. Enbridge to Enter into JV Connecting Permian Basin Natural Gas Supply to Growing LNG and USGC Demand