Difference between revisions of "North European Natural Gas Pipeline (NEL)"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Source: * Destination: * Ownership: Gascade * Website: https://www.gascade.de/ * Length: kilometres ( miles) * Capacity: per day * Status:...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Source: | + | * Source: Greifswald |
* Destination: | * Destination: | ||
* Ownership: Gascade | * Ownership: Gascade | ||
* Website: https://www.gascade.de/ | * Website: https://www.gascade.de/ | ||
− | * Length: | + | * Length: 441 kilometres ( miles) |
* Capacity: per day | * Capacity: per day | ||
− | * Status: | + | * Status: Operating |
=== Details === | === Details === | ||
− | * - | + | * The NEL runs from the receiving site near Greifswald in a westerly direction through Mecklenburg-Western Pomerania to Lower Saxony. |
+ | * It is also linked to the [[European Gas Pipeline Link (EUGAL)]], so that gas can flow both to the west and to the south. | ||
+ | * In the West the pipeline connects to the [[MIDAL Gas Pipeline]] | ||
+ | |||
=== History === | === History === | ||
− | * - | + | * 2013 - Commercial operations launched |
=== Other Information === | === Other Information === |
Latest revision as of 10:02, 10 May 2024
Summary Information
- Source: Greifswald
- Destination:
- Ownership: Gascade
- Website: https://www.gascade.de/
- Length: 441 kilometres ( miles)
- Capacity: per day
- Status: Operating
Details
- The NEL runs from the receiving site near Greifswald in a westerly direction through Mecklenburg-Western Pomerania to Lower Saxony.
- It is also linked to the European Gas Pipeline Link (EUGAL), so that gas can flow both to the west and to the south.
- In the West the pipeline connects to the MIDAL Gas Pipeline
History
- 2013 - Commercial operations launched
Other Information
- -