Difference between revisions of "Nord-West Oelleitung Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: Wilhelmshaven * Destination: Köln * Ownership: Nord West Oelleitung Gmbh * Website: https://www.nwowhv.de/NWOHOMEPAGE/en/index.html * Length:...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Source: Wilhelmshaven | * Source: Wilhelmshaven | ||
* Destination: Köln | * Destination: Köln | ||
* Ownership: Nord West Oelleitung Gmbh | * Ownership: Nord West Oelleitung Gmbh | ||
− | * Website: https:// | + | * Website: https://nwowhv.de/en/home/ |
− | * Length: | + | * Length: 391 kilometres ( miles) |
− | * Capacity: | + | * Capacity: 320,000 barrels of oil per day |
* Crude Type: | * Crude Type: | ||
− | + | === The Route === | |
− | + | * NWO’s pipeline measures 28 inches in diameter and is 391 km long with its branch pipelines included. | |
* The pipeline source is a tank farm in Wilhelmshaven, on the Baltic coast. | * The pipeline source is a tank farm in Wilhelmshaven, on the Baltic coast. | ||
* The pipeline runs from North to South, bringing crude oil to refineries in the West of Germany. | * The pipeline runs from North to South, bringing crude oil to refineries in the West of Germany. | ||
Line 18: | Line 18: | ||
** [[Gelsenkirchen Refinery]] | ** [[Gelsenkirchen Refinery]] | ||
− | + | === Pipeline Status === | |
* In operation | * In operation | ||
− | + | === History === | |
− | * | + | * 1956 - Company formed |
+ | * 1958 - Pipeline commissioned | ||
− | + | === Other Information === | |
* | * | ||
− | + | === Links === | |
− | + | # [https://nwowhv.de/en/facts-and-figures/ NWO, Facts and Figures] |
Latest revision as of 11:09, 8 May 2024
Summary Information
- Source: Wilhelmshaven
- Destination: Köln
- Ownership: Nord West Oelleitung Gmbh
- Website: https://nwowhv.de/en/home/
- Length: 391 kilometres ( miles)
- Capacity: 320,000 barrels of oil per day
- Crude Type:
The Route
- NWO’s pipeline measures 28 inches in diameter and is 391 km long with its branch pipelines included.
- The pipeline source is a tank farm in Wilhelmshaven, on the Baltic coast.
- The pipeline runs from North to South, bringing crude oil to refineries in the West of Germany.
- Refineries supplied by the pipeline are:
Pipeline Status
- In operation
History
- 1956 - Company formed
- 1958 - Pipeline commissioned