Line 24: | Line 24: | ||
* 1977 - Phase I of the plant was commissioned | * 1977 - Phase I of the plant was commissioned | ||
* 1978 - Phase II was completed | * 1978 - Phase II was completed | ||
+ | * 2015 - NSMP acquired the terminal from Total | ||
+++ Links | +++ Links | ||
# [http://www.total-icop.co.uk/fuka/ Total, FUKA] | # [http://www.total-icop.co.uk/fuka/ Total, FUKA] | ||
+ | # [https://abarrelfull.blogspot.com/2024/05/nsmp-acquires-major-pipeline-and.html NSMP Acquires Major Pipeline and Terminal System from Total E&P UK Limited] |
Revision as of 10:05, 8 May 2024
Summary Information
- Ownership: Total
- Website: http://www.total.com/en
- Location: St Fergus, Scotland
- Capacity:
+++ Brief Description
- It is a 3-train process plant that is now known as the Frigg UK Terminal.
- Gas is transported to the plant by the **Frigg UK Gas Pipeline System** and from the Vesterled Gas Pipeline which brings gas from the Norwegian sector
- The Shetland Island Regional Gas Export Pipeline System (SIRGE) will permit the tie-in of West of Shetland gas into FUKA.
- The SIRGE pipeline runs from the Shetland Gas Plant (SGP) at Sullom Voe on Shetland to a sub-sea tie-in on the FUKA Pipeline at the MCP01 bypass valves.
++++ Related Oil and Gas Fields
- It processes gas from the Alwyn Area (Alwyn North, Forvie, Grant, Jura, Nuggets, Islay, Dunbar and Ellon), Bruce, Rhum, Keith, Buzzard, the Flotta Catchment Area, Ross and Captain.
+++ Ongoing Projects
- -
+++ Other Information
- -
+++ History
- 1977 - Phase I of the plant was commissioned
- 1978 - Phase II was completed
- 2015 - NSMP acquired the terminal from Total