− | Summary Information | + | === Summary Information === |
* Operator: Shell | * Operator: Shell | ||
* Country: UK | * Country: UK | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The Clipper complex is the main installation for the Sole Pit fields. Situated 72 kilometres north east of the East Anglian coast in the Southern North Sea. | * The Clipper complex is the main installation for the Sole Pit fields. Situated 72 kilometres north east of the East Anglian coast in the Southern North Sea. | ||
* The Clipper is made up of five bridge-linked platforms – the wellhead platform, a production platform, a compression platform, a Riser Platform and a metering platform. | * The Clipper is made up of five bridge-linked platforms – the wellhead platform, a production platform, a compression platform, a Riser Platform and a metering platform. | ||
Line 20: | Line 20: | ||
− | + | === Contractors === | |
* '''Sembmarine SLP:''' | * '''Sembmarine SLP:''' | ||
** Clipper PR Platform - EPIC lump sum contracted project including topsides, jacket and bridges, offshore hook-up and commissioning | ** Clipper PR Platform - EPIC lump sum contracted project including topsides, jacket and bridges, offshore hook-up and commissioning | ||
Line 33: | Line 33: | ||
* '''Icon Engineering:''' Skiff Platform Installation | * '''Icon Engineering:''' Skiff Platform Installation | ||
− | + | === History === | |
* 1988 - Government approval for Clipper & Barque | * 1988 - Government approval for Clipper & Barque | ||
* 1990 - Barque PL Platform installed | * 1990 - Barque PL Platform installed | ||
Line 44: | Line 44: | ||
* 2006 - Cutter QC Platform installed | * 2006 - Cutter QC Platform installed | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [https://www.og.decc.gov.uk/web_files/ems/2012/Shell-ems.pdf Shell, EMS, 2011] | # [https://www.og.decc.gov.uk/web_files/ems/2012/Shell-ems.pdf Shell, EMS, 2011] | ||
# [http://sembmarineslp.com/case-studies/carrack/ Sembmarine SLP, Carrick] | # [http://sembmarineslp.com/case-studies/carrack/ Sembmarine SLP, Carrick] |
Revision as of 16:00, 30 January 2024
Summary Information
- Operator: Shell
- Country: UK
- Location: Block 048/19a, Southern North Sea
- Production start: 1990
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Clipper complex is the main installation for the Sole Pit fields. Situated 72 kilometres north east of the East Anglian coast in the Southern North Sea.
- The Clipper is made up of five bridge-linked platforms – the wellhead platform, a production platform, a compression platform, a Riser Platform and a metering platform.
- First operational in 1990, the installation produces and processes gas from the wells on wellhead platform and gas is also imported from the satellite platforms, producing from the **Barque** (049/16), **Cutter**, **Carrack Gas Field** ** Galleon** and **Skiff** (048/20a) fields.
- The Barque field consists of 2 unmanned platforms, PL & PB
- The Galleon field consists of 2 unmanned platforms, PN & PG
- Cutter & Carrack have one platform each, Cutter QC and Carrack QA
- The Skiff field consist of a minimum facilities, Skiff PS, normally unmanned installation (NUI), connected via a pipeline to the Clipper platform which provides processing and export facility for the Skiff fluids of gas, condensate and water
- Gas is exported through a 24 inch diameter subsea pipeline to the Bacton Gas Plant in Norfolk.
Contractors
- Sembmarine SLP:
- Clipper PR Platform - EPIC lump sum contracted project including topsides, jacket and bridges, offshore hook-up and commissioning
- Carrack QA Platform: EPC contracted project including topside, jacket and piles, offshore hook-up and commissioning
- Rosetti Marino: Engineering, procurement, fabrication, testing, onshore commissioning, load-out and sea fastening of the Clipper Accommodation Module with integral Utility Deck and Helideck, the link bridge, the jacket and piles.
- Stolt Offshore: Skiff subsea installation
- Saipem: Pipeline T & I
- FoundOcean:
- Barque PL Scour Rectification
- Grouting for Skiff
- Nessco: Communication systems
- Icon Engineering: Skiff Platform Installation
History
- 1988 - Government approval for Clipper & Barque
- 1990 - Barque PL Platform installed
- 1990 - Clipper Gas Field came onstream
- 1993 - Barque South approved
- 1994 - First gas from Galleon
- 1995 - Barque PB Platform installed
- 2000 - Skiff development approved
- 2005 - Cutter development approved
- 2006 - Cutter QC Platform installed
Geology
Links
- Shell, EMS, 2011
- Sembmarine SLP, Carrick
- UK Oil and Gas Fields by Approval Date
- List Of Oil Production Platforms In The UK
- List Of Oil and Gas Production Platforms In The UK
- FoundOcean Subsea References
- Icon Engineering Platform References
- Nessco Platform References
- Rosetti Marino Platform References
- Saipem Pipeline References
- Serimax Pipeline References
- Licence P 8 - Licence Having Effect Under The Petroleum Act 1998 The Skiff Field