Difference between revisions of "Payara Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 11: | Line 11: | ||
=== Description === | === Description === | ||
* The development utilizes the [[Prosperity FPSO]] with production capacity of 220,000 gross barrels of oil per day | * The development utilizes the [[Prosperity FPSO]] with production capacity of 220,000 gross barrels of oil per day | ||
− | * Production will be ramped up until the middle of 2024, by adding more wells | + | * Production will be ramped up until the middle of 2024, by adding more wells. |
=== Contractors === | === Contractors === | ||
− | * - | + | * TechnipFMC: Manufacture and delivery of the subsea production system, including 41 enhanced vertical deep water trees and associated tooling, six flexible risers and ten manifolds along with associated controls and tie-in equipment. |
+ | * Keppel: FPSO integration and topsides manufacture | ||
=== History === | === History === |
Revision as of 14:23, 14 November 2023
Summary Information
- Operator: Exxon
- Country: Guyana
- Location: Stabroek Block, Offshore
- Production start:
- Partners: Esso - 45 %, Hess - 30 % and CNOOC - 25 %
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The development utilizes the Prosperity FPSO with production capacity of 220,000 gross barrels of oil per day
- Production will be ramped up until the middle of 2024, by adding more wells.
Contractors
- TechnipFMC: Manufacture and delivery of the subsea production system, including 41 enhanced vertical deep water trees and associated tooling, six flexible risers and ten manifolds along with associated controls and tie-in equipment.
- Keppel: FPSO integration and topsides manufacture
History
- 2023 - First oil produced
- 2023 - Chevron agreed to acquire Hess, becoming a partner
- 2023 - First oil produced