Difference between revisions of "Cluster 2 Oil and Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 11: | Line 11: | ||
=== Description === | === Description === | ||
* Located in the KG-DWN-98/2 Deep Water Block at a water depth of between 984 feet (300 meters) and 10,500 feet (3,200 meters) | * Located in the KG-DWN-98/2 Deep Water Block at a water depth of between 984 feet (300 meters) and 10,500 feet (3,200 meters) | ||
| − | * The development includes a Central processing Platform and 34 deepwater trees | + | * The development includes a Central processing Platform, the [[Armada Sterling V FPSO]] and 34 deepwater trees |
* Gas is processed at an onshore plant | * Gas is processed at an onshore plant | ||
| Line 18: | Line 18: | ||
** Subsea hardware including trees, manifolds, controls, connection systems, SPS installation tools and services, as well as flexible risers and flowlines, umbilical and topside controls | ** Subsea hardware including trees, manifolds, controls, connection systems, SPS installation tools and services, as well as flexible risers and flowlines, umbilical and topside controls | ||
* McDermott: | * McDermott: | ||
| − | ** Transportation and installation of a central processing platform (CPP) | + | ** Transportation and installation of a central processing platform (CPP) and living quarters |
** Transportation and installation of SURF and SPS facilities | ** Transportation and installation of SURF and SPS facilities | ||
Revision as of 07:43, 8 November 2023
Summary Information
- Operator: ONGC
- Country: India
- Location: Krishna Godavari basin
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- Located in the KG-DWN-98/2 Deep Water Block at a water depth of between 984 feet (300 meters) and 10,500 feet (3,200 meters)
- The development includes a Central processing Platform, the Armada Sterling V FPSO and 34 deepwater trees
- Gas is processed at an onshore plant
Contractors
- Baker Hughes:
- Subsea hardware including trees, manifolds, controls, connection systems, SPS installation tools and services, as well as flexible risers and flowlines, umbilical and topside controls
- McDermott:
- Transportation and installation of a central processing platform (CPP) and living quarters
- Transportation and installation of SURF and SPS facilities
History
- 2018 - Contracts awarded for the development
- 2022 - The U field came onstream
- 2023 - Installation contract awarded