Difference between revisions of "Cluster 2 Oil and Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
| − | * Operator: | + | * Operator: ONGC |
| − | * Country: | + | * Country: India |
| − | * Location: | + | * Location: Krishna Godavari basin |
* Production start: | * Production start: | ||
* Partners: | * Partners: | ||
| Line 10: | Line 10: | ||
=== Description === | === Description === | ||
| + | * Located in the KG-DWN-98/2 Deep Water Block | ||
* | * | ||
=== Contractors === | === Contractors === | ||
| + | * Baker Hughes: | ||
| + | ** Subsea hardware including trees, manifolds, controls, connection systems, SPS installation tools and services, as well as flexible risers and flowlines, umbilical and topside controls | ||
* McDermott: | * McDermott: | ||
** Transportation and installation of a central processing platform (CPP) and living quarters | ** Transportation and installation of a central processing platform (CPP) and living quarters | ||
| + | ** Transportation and installation of SURF and SPS facilities | ||
=== History === | === History === | ||
Revision as of 16:08, 7 November 2023
Summary Information
- Operator: ONGC
- Country: India
- Location: Krishna Godavari basin
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- Located in the KG-DWN-98/2 Deep Water Block
Contractors
- Baker Hughes:
- Subsea hardware including trees, manifolds, controls, connection systems, SPS installation tools and services, as well as flexible risers and flowlines, umbilical and topside controls
- McDermott:
- Transportation and installation of a central processing platform (CPP) and living quarters
- Transportation and installation of SURF and SPS facilities
History
- 2018 - Contracts awarded for the development
- 2023 - Installation contract awarded