Difference between revisions of "Ruby Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Petronas * Country: Vietnam * Location: * Production start: 2010 * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume:...") |
Abarrelfull (talk | contribs) |
||
Line 20: | Line 20: | ||
* **PTSC:** Construction of Ruby A and Ruby B Topsides | * **PTSC:** Construction of Ruby A and Ruby B Topsides | ||
* **Petrofac Rnz:** | * **Petrofac Rnz:** | ||
− | + | ** Ruby RBDP-B Debottlenecking Project | |
− | + | ** Topaz and Diamond Development | |
− | + | ** Provision of Ruby A Platform Re-Structure Analysis | |
+++ History | +++ History |
Latest revision as of 12:49, 31 October 2023
Summary Information
- Operator: Petronas
- Country: Vietnam
- Location:
- Production start: 2010
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The overall Ruby Field development consists of the existing Ruby A and Ruby B platforms, which currently supplies the full well stream to the Ruby II FPSO, and will also include the Pearl and Topaz fields which will be tied-in to the FPSO in the near future.
- Ruby II FPSO is based on total repair, life extension and conversion of the 1990 built Aframax tanker MT Cherry II.
- The FPSO features a bow mounted turret with nine (9) mooring lines and slots for a total of five (5) production risers and three (3) gaslift risers.
- The topsides are designed for a throughput of 45,000 barrels of total liquid per day, and in addition provides gas treatment and compression facilities to handle 11.5 million standard cubic feet of gas per day.
- FPSO Ruby II replaced the Ruby Princess FPSO
+++ Contractors
- **PTSC:** Construction of Ruby A and Ruby B Topsides
- **Petrofac Rnz:**
- Ruby RBDP-B Debottlenecking Project
- Topaz and Diamond Development
- Provision of Ruby A Platform Re-Structure Analysis
+++ History
- 2010 - FPSO Ruby II achieves first oil
+++ Geology
+++ Links