Difference between revisions of "Gulf Run Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
 
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
  
* Source:  
+
* Source: Carthage Hub
* Destination:  
+
* Destination: Perryville
* Ownership:  
+
* Ownership: Energy Transfer Partners
* Website:
+
* Website: https://www.energytransfer.com/
* Length:  kilometres ( miles)  
+
* Length:  kilometres (135 miles)  
* Capacity: per day  
+
* Capacity: 1.65 Bcf/day
 
* Status: Operating
 
* Status: Operating
  
Line 15: Line 15:
 
** Zone 1 connects the [[Carthage Hub]] to the Perryville markets. It has bi-directional flow capabilities, providing the ability to deliver significant volumes to Perryville as well as to the Golden Pass and [[Trunkline Gas Company Pipeline]].
 
** Zone 1 connects the [[Carthage Hub]] to the Perryville markets. It has bi-directional flow capabilities, providing the ability to deliver significant volumes to Perryville as well as to the Golden Pass and [[Trunkline Gas Company Pipeline]].
 
** Zone 2 extends south and connects to Golden Pass Pipeline and to Energy Transfer’s Trunkline system. The Zone 1 segment  
 
** Zone 2 extends south and connects to Golden Pass Pipeline and to Energy Transfer’s Trunkline system. The Zone 1 segment  
 +
* In total it is a 135-mile, 42-inch natural gas pipeline in Louisiana has a capacity of 1.65 Bcf/day
  
 
=== History ===
 
=== History ===
Line 24: Line 25:
 
=== Links ===
 
=== Links ===
 
# [[EIA Natural Gas Pipeline Projects 2015-2022]]
 
# [[EIA Natural Gas Pipeline Projects 2015-2022]]
 +
# [https://abarrelfull.blogspot.com/2023/09/energy-transfer-announces-gulf-run.html Energy Transfer Announces Gulf Run Transmission is in Service]
  
 
[[category:Pipeline]]
 
[[category:Pipeline]]
[[category:Country]]
+
[[category:USA]]
[[category:Company]]
+
[[category:Energy Transfer]]

Latest revision as of 08:56, 27 September 2023

Summary Information

  • Source: Carthage Hub
  • Destination: Perryville
  • Ownership: Energy Transfer Partners
  • Website: https://www.energytransfer.com/
  • Length: kilometres (135 miles)
  • Capacity: 1.65 Bcf/day
  • Status: Operating

Details

  • Gulf Run receives natural gas from Energy Transfer’s extensive intrastate and interstate pipeline network, including production directly from the Haynesville Shale.
  • Volumes originating from all the major natural gas basins in the U.S. have access to the pipeline, including the Permian Basin, the Barnett Shale, the Marcellus and Utica shales, East Texas, the Arkoma and the Anadarko basins.
  • The pipeline consists of two zones.
    • Zone 1 connects the Carthage Hub to the Perryville markets. It has bi-directional flow capabilities, providing the ability to deliver significant volumes to Perryville as well as to the Golden Pass and Trunkline Gas Company Pipeline.
    • Zone 2 extends south and connects to Golden Pass Pipeline and to Energy Transfer’s Trunkline system. The Zone 1 segment
  • In total it is a 135-mile, 42-inch natural gas pipeline in Louisiana has a capacity of 1.65 Bcf/day

History

  • 2022 - The pipeline enters commercial service

Other Information

  • -

Links

  1. EIA Natural Gas Pipeline Projects 2015-2022
  2. Energy Transfer Announces Gulf Run Transmission is in Service