Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Marathon * Country: Equatorial Guinea * Location: 12 miles north of Bioko Island * Production start: 2007 * Partners: Noble Energy - 34%, * Ty...") |
Abarrelfull (talk | contribs) |
||
Line 12: | Line 12: | ||
* Phase 1 of he project consists of a four-pile production platform, a tripod well protector platform, two in-field flowlines, and a 20-inch diameter trunk line leading to Bioko Island | * Phase 1 of he project consists of a four-pile production platform, a tripod well protector platform, two in-field flowlines, and a 20-inch diameter trunk line leading to Bioko Island | ||
* There are Four offshore production platforms and Onshore gas/condensate processing facilities | * There are Four offshore production platforms and Onshore gas/condensate processing facilities | ||
− | * The field supplies the [[ | + | * The field supplies the [[EG LNG Terminal]] with natural gas |
+ | * The Alba B3 Compression Platform enabled the recovery of more of the reserves. | ||
+++ Contractors | +++ Contractors | ||
* **Global Offshore:** Engineering, procurement, fabrication, transportation, installation, and start-up of pipelines and platforms | * **Global Offshore:** Engineering, procurement, fabrication, transportation, installation, and start-up of pipelines and platforms | ||
+ | * Hereema: Alba B3 compression engineering and construction | ||
+++ History | +++ History | ||
Line 28: | Line 30: | ||
* 2004 - Noble Energy announced a new natural gas and condensate discovery | * 2004 - Noble Energy announced a new natural gas and condensate discovery | ||
* 2007 - First cargo delivered from the EG LNG Terminal | * 2007 - First cargo delivered from the EG LNG Terminal | ||
+ | * 2016 - First Gas from Alba B3 Compression Platform | ||
+++ Geology | +++ Geology | ||
Line 38: | Line 41: | ||
# [http://www.epa.gov/gasstar/documents/workshops/2008-annual-conf/bremer.pdf EPA Partner Experience: Equatorial Guinea] | # [http://www.epa.gov/gasstar/documents/workshops/2008-annual-conf/bremer.pdf EPA Partner Experience: Equatorial Guinea] | ||
# [http://killajoules.wikidot.com/archive:global-industries-selected-for-alba-field-offshore-e Global Industries selected for Alba Field offshore Equatorial Guinea] | # [http://killajoules.wikidot.com/archive:global-industries-selected-for-alba-field-offshore-e Global Industries selected for Alba Field offshore Equatorial Guinea] | ||
+ | # [https://abarrelfull.blogspot.com/2023/09/marathon-oil-announces-first-gas-from.html Marathon Oil Announces First Gas from Alba B3 Compression Platform] |
Latest revision as of 14:44, 4 September 2023
Summary Information
- Operator: Marathon
- Country: Equatorial Guinea
- Location: 12 miles north of Bioko Island
- Production start: 2007
- Partners: Noble Energy - 34%,
- Type: Gas And Condensate
- Estimated Reserves:
- Production Volume:
+++ Description
- Phase 1 of he project consists of a four-pile production platform, a tripod well protector platform, two in-field flowlines, and a 20-inch diameter trunk line leading to Bioko Island
- There are Four offshore production platforms and Onshore gas/condensate processing facilities
- The field supplies the EG LNG Terminal with natural gas
- The Alba B3 Compression Platform enabled the recovery of more of the reserves.
+++ Contractors
- **Global Offshore:** Engineering, procurement, fabrication, transportation, installation, and start-up of pipelines and platforms
- Hereema: Alba B3 compression engineering and construction
+++ History
- 1984 - Discovery well 13B1-1X drilled
- 1991 - First Production (A platform: Alba 2, Alba 3)
- 1996 - LPG Plant construction complete (2,400 bpd)
- 2000 - Phase 1 Development, Offshore re- injection of gas commences
- 2001 - Methanol production begins
- 2002 - Equatorial Guinea Government Approval of Alba Field Expansion Project
- 2004 - Phase 2A Complete, Continuous flaring ceases
- 2004 - Noble Energy announced a new natural gas and condensate discovery
- 2007 - First cargo delivered from the EG LNG Terminal
- 2016 - First Gas from Alba B3 Compression Platform
+++ Geology
+++ Links
- Marathon and Partners Deliver First LNG Cargo From Equatorial Guinea Train 1 LNG Project Six Months Ahead of Original Schedule
- Noble Energy Announces Natural Gas and Condensate Discovery From Deep Test on the Alba Block in Equatorial Guinea
- Marathon Oil Company Announces Equatorial Guinea Government Approval of Alba Field Expansion Project
- EPA Partner Experience: Equatorial Guinea
- Global Industries selected for Alba Field offshore Equatorial Guinea
- Marathon Oil Announces First Gas from Alba B3 Compression Platform