Difference between revisions of "Galleon Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: * Country: UK * Location: 048/20a, Southern North Sea * Production start: 1994 * Partners: * Type: Gas * Estimated Reserves: * Prod...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Operator: | + | * Operator: Shell |
* Country: UK | * Country: UK | ||
* Location: 048/20a, Southern North Sea | * Location: 048/20a, Southern North Sea | ||
Line 21: | Line 21: | ||
* 1994 - First gas produced | * 1994 - First gas produced | ||
* 1998 - Centrica acquires a stake from Powergen | * 1998 - Centrica acquires a stake from Powergen | ||
+ | * 2017 - Spirit Energy inherits stake from Centrica | ||
=== Geology === | === Geology === | ||
Line 29: | Line 30: | ||
# [http://killajoules.wikidot.com/archive:exxon-shell-report-startup-of-north-sea-galleon-gas Exxon, Shell Report Startup Of North Sea Galleon Gas Field] | # [http://killajoules.wikidot.com/archive:exxon-shell-report-startup-of-north-sea-galleon-gas Exxon, Shell Report Startup Of North Sea Galleon Gas Field] | ||
# [http://killajoules.wikidot.com/archive:centrica-strikes-offshore-deal Centrica strikes offshore deal] | # [http://killajoules.wikidot.com/archive:centrica-strikes-offshore-deal Centrica strikes offshore deal] | ||
+ | # [https://abarrelfull.blogspot.com/2022/09/neptune-energy-completes-acquisition-of.html Neptune Energy completes the acquisition of ENGIE E&P International SA] |
Revision as of 06:29, 25 August 2023
Summary Information
- Operator: Shell
- Country: UK
- Location: 048/20a, Southern North Sea
- Production start: 1994
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Galleon development has a minimum facilities wellhead platform (Galleon PN) located on the southeast portion of the field.
- The platform is remotely controlled from the Clipper Gas Field
- Galleon gas flows to the Clipper complex, from where it is transported to the Bacton Gas Plant
Contractors
- -
History
- 1992 - Government approval granted for development
- 1994 - First gas produced
- 1998 - Centrica acquires a stake from Powergen
- 2017 - Spirit Energy inherits stake from Centrica