Difference between revisions of "Cambo Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 20: | Line 20: | ||
* 2002 - Cambo field discovered | * 2002 - Cambo field discovered | ||
* 2019 Sevan awarded basic engineering for the FPSO | * 2019 Sevan awarded basic engineering for the FPSO | ||
| + | * 2022 - MOU signed to collaborate in the electrification of oil fields West of Shetland | ||
* 2022 - Ithaca became operator after acquiring Siccar Point | * 2022 - Ithaca became operator after acquiring Siccar Point | ||
| Line 27: | Line 28: | ||
=== Links === | === Links === | ||
# [https://abarrelfull.blogspot.com/2023/05/sevan-ssp-and-sembcorp-marine-continue.html Sevan SSP and Sembcorp Marine continue engineering work on Siccar Point Cambo] | # [https://abarrelfull.blogspot.com/2023/05/sevan-ssp-and-sembcorp-marine-continue.html Sevan SSP and Sembcorp Marine continue engineering work on Siccar Point Cambo] | ||
| + | # [https://abarrelfull.blogspot.com/2023/05/west-of-shetland-oil-and-gas-field.html West Of Shetland Oil And Gas Field Owners Agree To Explore Electrification Options] | ||
# [https://a-barrel-full.blogspot.com/2023/05/ithaca-energy-announces-agreement-with.html Ithaca Energy Announces Agreement With Shell To Market Working Interests In Cambo] | # [https://a-barrel-full.blogspot.com/2023/05/ithaca-energy-announces-agreement-with.html Ithaca Energy Announces Agreement With Shell To Market Working Interests In Cambo] | ||
Revision as of 13:27, 7 May 2023
Summary Information
- Operator: Ithaca
- Country: United Kingdom
- Location: West of Shetland
- Production start:
- Partners: Ithaca, Shell
- Type: Oil
- Estimated Reserves:
- Production Volume:
Description
- The Cambo field is the second largest undeveloped oil and gas discovery in the UK North Sea, located in the West of Shetland region.
- Cambo will be developed using a purpose-built Sevan FPSO. Modern equipment designed to operate without the need for routine flaring or venting of hydrocarbons will be used to reduce emissions.
- When production commences, the field is expected to produce less than half of the amount of CO2 for each barrel produced than the average UK field. The development will be built electrification-ready.
Contractors
- Sevan SSP and Sembcorp Marine: Basic engineering for the FPSO
History
- 2002 - Cambo field discovered
- 2019 Sevan awarded basic engineering for the FPSO
- 2022 - MOU signed to collaborate in the electrification of oil fields West of Shetland
- 2022 - Ithaca became operator after acquiring Siccar Point
Geology
- The field is a large basement high with sedimentary sequences atop the structure and sits on the Corona Ridge structural feature.