* 2011 - BP announced today the drilling of a successful appraisal well in a previously untested northern segment | * 2011 - BP announced today the drilling of a successful appraisal well in a previously untested northern segment | ||
* 2013 - FMC awarded contract for phase 2 equipment | * 2013 - FMC awarded contract for phase 2 equipment | ||
+ | * 2023 - Argos platform came on stream | ||
=== Geology === | === Geology === | ||
Line 63: | Line 64: | ||
# [http://killajoules.wikidot.com/blog:2450 Technip awarded a key engineering contract for Mad Dog Phase 2 in the Gulf of Mexico] | # [http://killajoules.wikidot.com/blog:2450 Technip awarded a key engineering contract for Mad Dog Phase 2 in the Gulf of Mexico] | ||
# [http://killajoules.wikidot.com/blog:3973 FMC Technologies Awarded Subsea Contract for BP's Mad Dog Phase 2] | # [http://killajoules.wikidot.com/blog:3973 FMC Technologies Awarded Subsea Contract for BP's Mad Dog Phase 2] | ||
+ | # [https://a-barrel-full.blogspot.com/2023/04/bp-starts-oil-production-at-argos.html bp starts oil production at Argos platform in the Gulf of Mexico] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:USA]] | [[category:USA]] | ||
[[category:BP]] | [[category:BP]] |
Revision as of 10:07, 14 April 2023
Summary Information
- Operator: BP
- Country: USA
- Location: Green Kanyon Blocks 738, 781, 782, 825 & 826, Gulf of Mexico
- Production start: 2004
- Partners: BP - 60.5 %, BHP Billiton- 23.9 %, Chevron - 15.6 %
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Mad Dog Field started production in 2005 and utilizes a truss spar platform, equipped with facilities for simultaneous production and drilling operations. The facility is designed to process 80,000 barrels/day of oil and 60,000 standard cubic feet/day of gas.
- The Mad Dog development consists of a truss spar, equipped with facilities for simultaneous production and drilling operations. Oil from Mad Dog will be transported via the [[[Caesar Oil Pipeline]]] to Ship Shoal 332B, where it will interconnect with the [[[Cameron Highway Oil Pipeline]]] System (CHOPS).
- Mad Dog gas will be exported via the [[[Cleopatra Natural Gas Pipeline]]] to Ship Shoal 332A, where it will interconnect with Manta Ray Gathering System, and from there to the Nautilus Gas Transportation System into Louisiana.
- Both Caesar and Cleopatra pipelines are part of the BP-operated [[[Mardi Gras Offshore Oil And Gas Pipeline System]]].
Contractors
- **Rauma Repola:** Construction of Spar Hull
- **McDermott:** Construction of 8,400-ST spar hull topsides
- **Mustang:**
* Topsides design, including detailed design and fabrication support * Project controls support and interface coordination of hull, riser, and drill rig systems
- **AMEC:**
* Topsides design contract on Mad Dog Phase 2 * Hook up and commissioning services
- **Technip:** Front end engineering design (FEED) contract of a Spar hull and mooring systems for the Mad Dog Phase 2 Project
- **FMC Technologies:** Supply subsea trees, manifolds, and jumper equipment
- **Saipem:** Drilling Rig Replacement Project
- **BiFab:** Design and Project Management for Local Equipment Room / Drillers Control Cabin
- **J P Kenny:** Concept selection for both wet and dry development scenarios, development of field architecture, evaluation of horizontal verses vertical trees and cost estimates for both options
- **Emtunga:** Upgrade of living quarters
History
- 1998 - Mad Dog was discovered
- 1998 - Unocal acquired 25% stake
- 2001 - The Mad Dog-4 appraisal well drilled
- 2003 - AMEC awarded contract hook up and commissioning services
- 2004 - First production
- 2011 - BP announced today the drilling of a successful appraisal well in a previously untested northern segment
- 2013 - FMC awarded contract for phase 2 equipment
- 2023 - Argos platform came on stream
Geology
Links
- Mustang Engineering Platform References
- McDermott Platform References
- International Protective Coatings Platform References
- Saipem Saipem Fixed Offshore Production Facilities Major Projects
- Bifab Platform References
- J P Kenny Subsea References
- Emtunga Offshore Platform References
- Gulf Of Mexico Permanent Deepwater Structures
- Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields
- BP Amoco Announces Four Major Deepwater Finds in Gulf of Mexico
- Spirit Energy 76 to acquire 25% interest in deepwater Mad Dog prospect
- BP Begins Production at Mad Dog in Deepwater Gulf of Mexico
- AMEC Awarded New Oil and Gas Contract by BP in Gulf of Mexico
- BHP Billiton today announced results from appraisal and exploratory drilling in the Gulf of Mexico
- Enterprise Facilities Receive First Deliveries From Significant Discoveries in Deepwater Gulf of Mexico
- BP Announces Significant Resource Extension of Mad Dog Field in Gulf Of Mexico
- AMEC awarded topsides design contract on Mad Dog Phase 2 deepwater project, Gulf of Mexico
- Technip awarded a key engineering contract for Mad Dog Phase 2 in the Gulf of Mexico
- FMC Technologies Awarded Subsea Contract for BP's Mad Dog Phase 2
- bp starts oil production at Argos platform in the Gulf of Mexico