Difference between revisions of "Cedar LNG Export Terminal Project"

From A Barrel Full
Jump to navigation Jump to search
Line 23: Line 23:
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
 
* Suppliers: Natural gas will be transported to the Cedar LNG site through the Coastal GasLink pipeline
 
* Suppliers: Natural gas will be transported to the Cedar LNG site through the Coastal GasLink pipeline
* Customers:
+
* Customers: ARC Resources - 1.5 million tonnes of LNG per year
  
 
=== History ===
 
=== History ===
 
* 2022 - Black & Veatch Awarded Front End Engineering and Design
 
* 2022 - Black & Veatch Awarded Front End Engineering and Design
 +
* 2023 - B.C. Environmental Approval
 +
* 2023 - MOU signed with ARC for sale of LNG
  
 
=== Other Information ===
 
=== Other Information ===
Line 33: Line 35:
 
=== Links ===
 
=== Links ===
 
# [https://lng-news.blogspot.com/2022/03/black-veatch-awarded-front-end.html Black & Veatch Awarded Front End Engineering and Design for Proposed Floating Liquified Natural Gas Project in British Columbia]
 
# [https://lng-news.blogspot.com/2022/03/black-veatch-awarded-front-end.html Black & Veatch Awarded Front End Engineering and Design for Proposed Floating Liquified Natural Gas Project in British Columbia]
 +
# [https://lng-news.blogspot.com/2023/03/cedar-lng-receives-bc-environmental.html Cedar LNG Receives B.C. Environmental Approval and Signs Memorandum of Understanding with ARC Resources Ltd.]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:Canada]]
 
[[category:Canada]]

Revision as of 16:50, 18 March 2023

Summary Information

  • Ownership: Cedar LNG ( Haisla Nation and Pembina Pipeline Corporation)
  • Website: https://www.cedarlng.com/
  • Location: The Project is located on Haisla Nation-owned land in Douglas Channel, Kitimat, British Colombia
  • Capacity: 3.0 million tons/annum
  • Status: Planned

Brief Description

  • The Cedar LNG Project is a partnership between the Haisla Nation and Pembina Pipeline Corporation to develop a floating liquefied natural gas (FLNG) facility in Kitimat, British Columbia, Canada
  • The terminal will be powered by the local grid which uses hydro

Technical Details

  • Storage capacity:
  • Constructor:
    • Black & Veatch and Samsung Heavy Industries: Front End Engineering and Design for the vessel
    • Samsung Heavy Industries will construct the vessel
  • Licensor: Black & Veatch

Ongoing Projects/Project Status

  • Commissioning is expected in 2027

Suppliers / Customers

  • Suppliers: Natural gas will be transported to the Cedar LNG site through the Coastal GasLink pipeline
  • Customers: ARC Resources - 1.5 million tonnes of LNG per year

History

  • 2022 - Black & Veatch Awarded Front End Engineering and Design
  • 2023 - B.C. Environmental Approval
  • 2023 - MOU signed with ARC for sale of LNG

Other Information

  • -

Links

  1. Black & Veatch Awarded Front End Engineering and Design for Proposed Floating Liquified Natural Gas Project in British Columbia
  2. Cedar LNG Receives B.C. Environmental Approval and Signs Memorandum of Understanding with ARC Resources Ltd.