Difference between revisions of "N05-A Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 35: | Line 35: | ||
[[category:Field]] | [[category:Field]] | ||
[[category:Netherlands]] | [[category:Netherlands]] | ||
| − | [[category: | + | [[category:One Dyas]] |
Revision as of 16:38, 18 March 2023
Summary Information
- Operator: One Dyas
- Country: https://onedyas.com/
- Location: North Sea, Netherlands
- Production start: 2024 target
- Partners: ONE-Dyas, Hansa Hydrocarbons and EBN
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The largest new gas development in the Netherlands in the last 15 years.
- The expected volume to be produced from the N05-A field and surrounding prospects is 4.5 to 13 BCM
- The platform will be connected to an offshore windfarm, to reduce emissions.
Contractors
- Allseas: Pipeline installation and burial
- HSM: Platform construction
- Heerema Marine Contractors: Platform installation
History
- 2022 - HSM awarded platform contract
- 2023 - Final investment decision