Difference between revisions of "Huelva LNG Terminal"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 1: | Line 1: | ||
| − | Summary Information  | + | === Summary Information ===  | 
* Ownership: Enagas  | * Ownership: Enagas  | ||
| Line 7: | Line 7: | ||
* Status: In Operation  | * Status: In Operation  | ||
| − | + | === Brief Description ===  | |
* A large regasification terminal  | * A large regasification terminal  | ||
| − | + | === Technical Details ===  | |
* Storage capacity: 60,000 m3 + 105,000 m3 + 2 * 150,000 m3  | * Storage capacity: 60,000 m3 + 105,000 m3 + 2 * 150,000 m3  | ||
* Unloading capacity:  | * Unloading capacity:  | ||
* Send out capacity:    | * Send out capacity:    | ||
* Constructor:  | * Constructor:  | ||
| − | + | ** Expansion:    | |
| − | + | ** **Foster Wheeler** - Detailed engineering, equipment and material procurement, and construction supervision  | |
| − | + | ** **Freyssinet:** Pre-stressing for LNG tanks 3,4 &5  | |
| − | + | ** **Saipem:** Construction of tanks 3 & 4  | |
| − | + | === Ongoing Projects/Project Status ===  | |
* A fifth tank of capacity 150.000 m3 is under construction    | * A fifth tank of capacity 150.000 m3 is under construction    | ||
| − | + | === Suppliers / Customers ===  | |
* Suppliers:    | * Suppliers:    | ||
* Customers:    | * Customers:    | ||
| − | + | === History ===  | |
* 1988 - Terminal commences operations with a single tank of 60,000 m3    | * 1988 - Terminal commences operations with a single tank of 60,000 m3    | ||
* 1992 - The second tank (105,000 m3) came into operation    | * 1992 - The second tank (105,000 m3) came into operation    | ||
| Line 36: | Line 36: | ||
* 2006 - The fourth tank (150,000 m3) came into operation  | * 2006 - The fourth tank (150,000 m3) came into operation  | ||
| − | + | === Other Information  | |
* -  | * -  | ||
| − | + | === Links ===  | |
# [http://www.enagas.es/cs/Satellite?cid=1142417697959&language=en&pagename=ENAGAS%2FPage%2FENAG_pintarContenidoFinal Terminal Webpage]  | # [http://www.enagas.es/cs/Satellite?cid=1142417697959&language=en&pagename=ENAGAS%2FPage%2FENAG_pintarContenidoFinal Terminal Webpage]  | ||
| − | #   | + | # [[Freyssinet LNG Tank References]]  | 
| − | #   | + | # [[Saipem LNG References]]  | 
# [http://killajoules.wikidot.com/archive:foster-wheeler-iberia-wins-two-lng-terminal-expansio Foster Wheeler Iberia Wins Two LNG Terminal Expansion Projects in Spain]  | # [http://killajoules.wikidot.com/archive:foster-wheeler-iberia-wins-two-lng-terminal-expansio Foster Wheeler Iberia Wins Two LNG Terminal Expansion Projects in Spain]  | ||
Latest revision as of 14:24, 19 February 2023
Contents
Summary Information
- Ownership: Enagas
 - Website: http://www.enagas.es/
 - Location: The plant is located at the mouth of the rivers Tinto and Odiel, Huelva
 - Capacity: million tons/annum
 - Status: In Operation
 
Brief Description
- A large regasification terminal
 
Technical Details
- Storage capacity: 60,000 m3 + 105,000 m3 + 2 * 150,000 m3
 - Unloading capacity:
 - Send out capacity:
 - Constructor:
- Expansion:
 - **Foster Wheeler** - Detailed engineering, equipment and material procurement, and construction supervision
 - **Freyssinet:** Pre-stressing for LNG tanks 3,4 &5
 - **Saipem:** Construction of tanks 3 & 4
 
 
Ongoing Projects/Project Status
- A fifth tank of capacity 150.000 m3 is under construction
 
Suppliers / Customers
- Suppliers:
 - Customers:
 
History
- 1988 - Terminal commences operations with a single tank of 60,000 m3
 - 1992 - The second tank (105,000 m3) came into operation
 - 2002 - Foster Wheeler awarded detailed engineering, equipment and material procurement, and construction supervision for expansion
 - 2004 - The third tank (150,000 m3) came into operation
 - 2006 - The fourth tank (150,000 m3) came into operation
 