Difference between revisions of "Kaombo Twin FPSOs"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 2: | Line 2: | ||
* Name: Kaombo Norte and Kaombo Sul | * Name: Kaombo Norte and Kaombo Sul | ||
− | * Field: [[Kaombo Oil | + | * Field: [[Kaombo Oil and Gas Fields]] |
* Country: Angola | * Country: Angola | ||
* Ownership: Total | * Ownership: Total | ||
Line 17: | Line 17: | ||
+++ Contractors | +++ Contractors | ||
* **Saipem:** | * **Saipem:** | ||
− | + | ** Engineering, procurement, conversion of the tankers, fabrication and integration of the topsides of the FPSO units and the installation of the mooring systems | |
− | + | ** Hook-up, commissioning and operations start-up | |
− | + | ** Seven years of operation and maintenance services for the FPSO units. | |
* **Sembawang Shipyard:** | * **Sembawang Shipyard:** | ||
− | + | ** Refurbishment of the VLCCs, construction engineering, the fabrication of flare, helideck, upper turret and access structure, integration of the topsides modules, lower turret components, and pre-commissioning of the FPSOs | |
* **Alderley:** Design, engineer and fabricate Produced Water Treatment Packages | * **Alderley:** Design, engineer and fabricate Produced Water Treatment Packages | ||
Revision as of 22:11, 23 January 2023
Summary Information
- Name: Kaombo Norte and Kaombo Sul
- Field: Kaombo Oil and Gas Fields
- Country: Angola
- Ownership: Total
- Website:
- Field Operated By:
- Capacity: 115,000 bpd
- Year of Completion:
+++ Brief Description
- The two converted FPSO units, will each have an oil treating capacity of 115,000 barrels per day, a water injection capacity of 200,000 barrels per day, a 100 million scfd gas compression capacity and a storage capacity of 1.7 million barrels of oil.
- The vessels being converted are the VLCC, Olympia and VLCC, Antartica
+++ Contractors
- **Saipem:**
- Engineering, procurement, conversion of the tankers, fabrication and integration of the topsides of the FPSO units and the installation of the mooring systems
- Hook-up, commissioning and operations start-up
- Seven years of operation and maintenance services for the FPSO units.
- **Sembawang Shipyard:**
- Refurbishment of the VLCCs, construction engineering, the fabrication of flare, helideck, upper turret and access structure, integration of the topsides modules, lower turret components, and pre-commissioning of the FPSOs
- **Alderley:** Design, engineer and fabricate Produced Water Treatment Packages
+++ Status
- Under construction
+++ History
- 2014 - Saipem awarded engineering, procurement, installation and commissioning contract
+++ Other Information
- -
+++ Links