Difference between revisions of "Ghasha and Hail Sour Gas Fields"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  (Created page with "=== Summary Information === * Operator: ADNOC * Country: Abu Dhabi * Location:  * Production start:  * Partners:  * Type: Oil / Gas * Estimated Reserves:  * Production Volume:...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 13: | Line 13: | ||
=== Contractors ===  | === Contractors ===  | ||
| − | *   | + | * Tecnimont, Technip Energies and Samsung Engineering: Early engineering and procurement works  | 
=== History ===  | === History ===  | ||
* 2018 - Eni bought a 25 percent stake the project  | * 2018 - Eni bought a 25 percent stake the project  | ||
| + | * 2023 - Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works  | ||
=== Geology ===  | === Geology ===  | ||
| Line 23: | Line 24: | ||
=== Links ===  | === Links ===  | ||
# [http://killajoules.wikidot.com/archive:eni-signs-ghasha-gas-concession-with-adnoc-strengthe Eni signs Ghasha gas concession with ADNOC strengthening its presence in the United Arab Emirates]  | # [http://killajoules.wikidot.com/archive:eni-signs-ghasha-gas-concession-with-adnoc-strengthe Eni signs Ghasha gas concession with ADNOC strengthening its presence in the United Arab Emirates]  | ||
| + | # [https://a-barrel-full.blogspot.com/2023/01/a-jv-composed-of-tecnimont-technip.html A JV composed of Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works contract for a total value of USD 80 million by ADNOC for the Hail & Ghasha Gas Development Project in Abu Dhabi]  | ||
Revision as of 12:44, 22 January 2023
Summary Information
- Operator: ADNOC
 - Country: Abu Dhabi
 - Location:
 - Production start:
 - Partners:
 - Type: Oil / Gas
 - Estimated Reserves:
 - Production Volume: Planned - 1.5 billion standard cubic feet (bscfd) of natural gas per day
 
Description
- The Ghasha mega-project is the world’s largest offshore sour gas development
 
Contractors
- Tecnimont, Technip Energies and Samsung Engineering: Early engineering and procurement works
 
History
- 2018 - Eni bought a 25 percent stake the project
 - 2023 - Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works
 
Geology
Links
- Eni signs Ghasha gas concession with ADNOC strengthening its presence in the United Arab Emirates
 - A JV composed of Tecnimont, Technip Energies and Samsung Engineering awarded early engineering and procurement works contract for a total value of USD 80 million by ADNOC for the Hail & Ghasha Gas Development Project in Abu Dhabi