Difference between revisions of "Troll Oil Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 11: | Line 11: | ||
+++ Brief Description | +++ Brief Description | ||
− | * The pipeline system transports oil from the [[Troll Oil | + | * The pipeline system transports oil from the [[Troll Oil and Gas Field]] to Mongstad. It consists of two pipelines: |
** Troll Oil Pipeline I is 16" diameter, 85 km length and has transport capacity 42,500 m3/day from Troll B Platform | ** Troll Oil Pipeline I is 16" diameter, 85 km length and has transport capacity 42,500 m3/day from Troll B Platform | ||
** Troll Pipeline II is 20" diameter, 80 km length and has transport capacity 40,000 m3/day from Troll C Platform | ** Troll Pipeline II is 20" diameter, 80 km length and has transport capacity 40,000 m3/day from Troll C Platform |
Latest revision as of 11:26, 6 January 2023
Summary Information
- Source: Troll Oil and Gas Field
- Destination: Mongstad, Norway
- Ownership:
- Website:
- Length: 165 kilometres ( miles)
- Capacity: barrels of oil per day
- Crude Type: Troll
+++ Brief Description
- The pipeline system transports oil from the Troll Oil and Gas Field to Mongstad. It consists of two pipelines:
- Troll Oil Pipeline I is 16" diameter, 85 km length and has transport capacity 42,500 m3/day from Troll B Platform
- Troll Pipeline II is 20" diameter, 80 km length and has transport capacity 40,000 m3/day from Troll C Platform
+++ Pipeline Status
- In operation
+++ History
- 1995 - Troll Pipeline I completed
- 1999 - Troll Pipeline II completed
+++ Other Information
- -
+++ Links