Difference between revisions of "Saguaro Connector Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Source: * Destination: * Ownership: * Website: * Length: kilometres ( miles) * Capacity: per day * Status: (Operating/Planned/Under Cons...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Source: | + | * Source: Waha gas hub, Texas |
* Destination: | * Destination: | ||
− | * Ownership: | + | * Ownership: Oneok |
* Website: | * Website: | ||
− | * Length: kilometres ( miles) | + | * Length: kilometres (155 miles) |
* Capacity: per day | * Capacity: per day | ||
* Status: (Operating/Planned/Under Construction) | * Status: (Operating/Planned/Under Construction) | ||
=== Details === | === Details === | ||
− | * - | + | * The potential Saguaro Connector Pipeline would consist of approximately 155 miles of 48-inch-diameter natural gas pipeline originating at the Waha Hub in Pecos County, Texas. The ultimate design capacity of the potential pipeline would be approximately 2.8 billion cubic feet per day. |
+ | * Final investment decision on the potential pipeline is expected by mid-2023 | ||
+ | * The pipeline will connect at the International Boundary with a new pipeline under development in Mexico for delivery to an export facility on the West Coast of Mexico | ||
=== History === | === History === | ||
− | * - | + | * 2022 - Presidential Permit application filed with the Federal Energy Regulatory Commission for construction of the international connector |
=== Other Information === | === Other Information === | ||
Line 19: | Line 21: | ||
=== Links === | === Links === | ||
− | # [] | + | # [https://a-barrel-full.blogspot.com/2022/12/oneoks-saguaro-connector-pipeline-files.html Oneok's Saguaro Connector Pipeline Files Permit Application For Proposed Natural Gas Border-Crossing Facilities At The U.S. And Mexico Border] |
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:USA]] | [[category:USA]] | ||
[[category:Oneok]] | [[category:Oneok]] |
Latest revision as of 15:51, 30 December 2022
Summary Information
- Source: Waha gas hub, Texas
- Destination:
- Ownership: Oneok
- Website:
- Length: kilometres (155 miles)
- Capacity: per day
- Status: (Operating/Planned/Under Construction)
Details
- The potential Saguaro Connector Pipeline would consist of approximately 155 miles of 48-inch-diameter natural gas pipeline originating at the Waha Hub in Pecos County, Texas. The ultimate design capacity of the potential pipeline would be approximately 2.8 billion cubic feet per day.
- Final investment decision on the potential pipeline is expected by mid-2023
- The pipeline will connect at the International Boundary with a new pipeline under development in Mexico for delivery to an export facility on the West Coast of Mexico
History
- 2022 - Presidential Permit application filed with the Federal Energy Regulatory Commission for construction of the international connector
Other Information
- -