(Created page with "=== Summary Information === * Ownership: Apache * Website: http://www.apachecorp.com/ * Location: St Fergus, Scotland * Capacity: 1990 mmscfd +++ Brief Description * The ter...")
 
Line 6: Line 6:
 
* Capacity: 1990 mmscfd
 
* Capacity: 1990 mmscfd
  
+++ Brief Description
+
=== Brief Description ===
 
* The terminal is fed by the [[[Scottish Area Gas Evacuation (SAGE) Pipeline]]] and the [[[Britannia Gas Pipeline]]]
 
* The terminal is fed by the [[[Scottish Area Gas Evacuation (SAGE) Pipeline]]] and the [[[Britannia Gas Pipeline]]]
 
* The SAGE Terminal nominal capacity is:  
 
* The SAGE Terminal nominal capacity is:  
* 1990 mmscfd (millions of standard cubic feet a day),  
+
** 1990 mmscfd (millions of standard cubic feet a day),  
* 5,300 tonnes/day Natural Gas Liquids (NGLs),  
+
** 5,300 tonnes/day Natural Gas Liquids (NGLs),  
* 2500 tonnes/day CO2 removal,  
+
** 2500 tonnes/day CO2 removal,  
* design H2S treatment to 1 ppm.  
+
** design H2S treatment to 1 ppm.  
 
* Gas capacity is split between 3 processing trains
 
* Gas capacity is split between 3 processing trains
 
* Train 3 processes feed gas from the Britannia pipeline only
 
* Train 3 processes feed gas from the Britannia pipeline only

Revision as of 12:29, 22 September 2022

Summary Information

Brief Description

  • The terminal is fed by the [[[Scottish Area Gas Evacuation (SAGE) Pipeline]]] and the [[[Britannia Gas Pipeline]]]
  • The SAGE Terminal nominal capacity is:
    • 1990 mmscfd (millions of standard cubic feet a day),
    • 5,300 tonnes/day Natural Gas Liquids (NGLs),
    • 2500 tonnes/day CO2 removal,
    • design H2S treatment to 1 ppm.  
  • Gas capacity is split between 3 processing trains
  • Train 3 processes feed gas from the Britannia pipeline only

++++ Related Oil and Gas Fields

+++ Ongoing Projects

  • -

+++ Other Information

  • -

+++ History

  • 1992 - Gas exports started from Beryl
  • 1993 - First delivers from Scott
  • 1994 - Brae began supplying gas
  • 1996 - Contract awarded for expansion project
  • 1998 - First gas from Britannia
  • 2011 - Apache acquired the terminal from Mobil