Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: PTT LNG * Website: http://www.pttlng.com/ * Location: Map Ta Phut Thailand * Capacity: 5.0 million tons/annum * Status: In operatio...") |
Abarrelfull (talk | contribs) |
||
| Line 7: | Line 7: | ||
* Status: In operation | * Status: In operation | ||
| − | + | === Brief Description === | |
* A large single train LNG gasification terminal | * A large single train LNG gasification terminal | ||
| − | + | === Technical Details === | |
* Storage capacity: 160,000 m3 x 2 | * Storage capacity: 160,000 m3 x 2 | ||
* Unloading capacity: LNG vessels size with 125,000 to 264,000 cubic meters capacity | * Unloading capacity: LNG vessels size with 125,000 to 264,000 cubic meters capacity | ||
| Line 20: | Line 20: | ||
| − | + | === Ongoing Projects/Project Status === | |
| − | * Project was completed in | + | * Project was completed in [[LNG Terminal Projects Completed in 2011 | 2011]] |
* PTT is planning to double the capacity of the terminal | * PTT is planning to double the capacity of the terminal | ||
| − | + | === Suppliers / Customers === | |
* Suppliers: | * Suppliers: | ||
* PTT has signed a deal to buy 1 million tonnes of LNG a year from Qatar from late 2011 | * PTT has signed a deal to buy 1 million tonnes of LNG a year from Qatar from late 2011 | ||
| Line 32: | Line 32: | ||
| − | + | === History === | |
* 2006 - Fluor awarded Project Management and Consultant role | * 2006 - Fluor awarded Project Management and Consultant role | ||
* 2008 - Consortium of GS/Kogas/HYC/DEC awarded construction contract | * 2008 - Consortium of GS/Kogas/HYC/DEC awarded construction contract | ||
| Line 39: | Line 39: | ||
* 2012 - PTT – Qatargas sign 20-year LNG supply agreement | * 2012 - PTT – Qatargas sign 20-year LNG supply agreement | ||
| − | + | === Other Information === | |
* This construction of LNG receiving terminal in Thailand is the first overseas LNG terminal project as Korean E&C companies. | * This construction of LNG receiving terminal in Thailand is the first overseas LNG terminal project as Korean E&C companies. | ||
Revision as of 14:48, 25 June 2022
Contents
Summary Information
- Ownership: PTT LNG
- Website: http://www.pttlng.com/
- Location: Map Ta Phut Thailand
- Capacity: 5.0 million tons/annum
- Status: In operation
Brief Description
- A large single train LNG gasification terminal
Technical Details
- Storage capacity: 160,000 m3 x 2
- Unloading capacity: LNG vessels size with 125,000 to 264,000 cubic meters capacity
- Send out capacity: 700 mmscfd
- Constructor:
* **Fluor:** Project Management and Consultant role * **GS/Kogas/HYC/DEC:** Integrated engineering, procurement, construction and commissioning services of a re-gasification and send-out system, a marine jetty with complete ship unloading facilities and two large full containment LNG storage tanks. * **Freyssinet:** Pre-stressing for LNG tanks
Ongoing Projects/Project Status
- Project was completed in 2011
- PTT is planning to double the capacity of the terminal
Suppliers / Customers
- Suppliers:
* PTT has signed a deal to buy 1 million tonnes of LNG a year from Qatar from late 2011 * PTT also plans to buy LNG in spot markets in 2011-2014 if market conditions are favourable
- Customers: The area has petrochemical, refinery, steel and fertiliser industries
History
- 2006 - Fluor awarded Project Management and Consultant role
- 2008 - Consortium of GS/Kogas/HYC/DEC awarded construction contract
- 2011 - The terminal receives its first cargo
- 2011 - Terminal opening
- 2012 - PTT – Qatargas sign 20-year LNG supply agreement
Other Information
- This construction of LNG receiving terminal in Thailand is the first overseas LNG terminal project as Korean E&C companies.
Links
- Freyssinet LNG Tank References
- 540 USD mil Overseas LNG Terminal Plant Award
- Thailand LNG Project Development and Outlook
- GS E&C-Led Team wins the first LNG Re-gasification Terminal Contract in Thailand
- Thailand's first LNG terminal to operate from July-PTT
- QATARGAS COMMISSIONS THAILAND’S FIRST LNG RECEIVING TERMINAL
- Thailand Minister of Energy inaugurates sixth gas separation plant and LNG terminal
- $400m LNG expansion
- PTT – Qatargas sign 20-year LNG supply agreement for energy reserve, greater national energy security with a supply start-up planned for early 2015