Difference between revisions of "Moscow Refinery Euro V+ Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 48: | Line 48: | ||
# [http://killajoules.wikidot.com/archive:russian-produced-equipment-for-construction-of-a-eur/ Russian-Produced Equipment For Construction Of A Euro+ Refining Facility At Gazprom Neft’s Moscow Refinery Is Delivered To Moscow] | # [http://killajoules.wikidot.com/archive:russian-produced-equipment-for-construction-of-a-eur/ Russian-Produced Equipment For Construction Of A Euro+ Refining Facility At Gazprom Neft’s Moscow Refinery Is Delivered To Moscow] | ||
+ | # [https://abarrelfull.blogspot.com/2022/01/president-of-russia-vladimir-putin.html President of Russia Vladimir Putin launches the new high-tech “Euro+” complex at the Gazprom Neft Moscow Refinery] |
Revision as of 11:58, 11 January 2022
Contents
Summary Information
- Ownership: Sibir / Gazprom Neft
- Website: http://www.gazprom-neft.com/
- Location: Moscow, Russia
- Wiki Page: Moscow Refinery
- Capacity: million tons/annum & bbl/day
- Nelson Complexity:
- Project Stage: Completed
- Expected Completion: 2020
- Budget:
The Project
- Project Type: Upgrade
- Project Summary:
- Main Contractors
Refining Units
- Vacuum distillation unit
- Fluidised catalytic cracker
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- -
Products Produced
- The project will result in more gasoline and less residual fuel oil
History
- 2017 - The VDU was delivered to the site
- 2020 - The project was completed
Other Information
- -