Difference between revisions of "Ust Luga LNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 9: | Line 9: | ||
=== Brief Description === | === Brief Description === | ||
* A two train liquefaction plant with 13 million tons of capacity | * A two train liquefaction plant with 13 million tons of capacity | ||
+ | * The plant will be built together with a gas processing complex with annual capacity of 45 billion cubic metres and a major olefins/polyolefins plant | ||
=== Technical Details === | === Technical Details === |
Revision as of 17:04, 30 December 2021
Contents
Summary Information
- Ownership: RusChemAlliance LLC, a 50-50 special-purpose venture of PJSC Gazprom and JSC RusGazDobycha
- Website: https://www.baltchemc.ru/
- Location: Ust Luga
- Capacity: 13 million tons/annum
- Status: Planned
Brief Description
- A two train liquefaction plant with 13 million tons of capacity
- The plant will be built together with a gas processing complex with annual capacity of 45 billion cubic metres and a major olefins/polyolefins plant
Technical Details
- Storage capacity:
- Constructor:
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 2026
Suppliers / Customers
- Suppliers:Gas fields on the Yamal peninsula, including Tambeyskoye field
- Customers:
History
- -
Other Information
- -