Difference between revisions of "Badejo-Siri Oil Field"

From A Barrel Full
Jump to navigation Jump to search
Line 20: Line 20:
 
* 2010 - [[Petrojarl Cidade De Rio Das Ostras FPSO]] relocated
 
* 2010 - [[Petrojarl Cidade De Rio Das Ostras FPSO]] relocated
 
* 2019 - Petrobras agreed to sell the field to Trident Energy
 
* 2019 - Petrobras agreed to sell the field to Trident Energy
 +
* 2020 - Trident energy acqires the field
  
+++ Geology
+
=== Geology ===
 
*
 
*
  

Revision as of 11:53, 9 December 2021

Summary Information

  • Operator: Petrobras
  • Country: Brazil
  • Location: Campos Basin
  • Production start: 2008
  • Partners:
  • Type: Heavy Oil
  • Estimated Reserves:
  • Production Volume:

+++ Description

+++ Contractors

  • -

History

Geology

Links

  1. Aibel wins breakthrough pilot contract for new technologies
  2. Teekay Announces Cidade De Rio Das Ostras FPSO Contract Extension
  3. Petrobras signs contracts for sale of shallow water assets in a total of US$ 1.5 billion