Difference between revisions of "Badejo-Siri Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 26: | Line 26: | ||
# [http://killajoules.wikidot.com/archive:aibel-wins-breakthrough-pilot-contract-for-new-techn Aibel wins breakthrough pilot contract for new technologies] | # [http://killajoules.wikidot.com/archive:aibel-wins-breakthrough-pilot-contract-for-new-techn Aibel wins breakthrough pilot contract for new technologies] | ||
# [http://killajoules.wikidot.com/archive:teekay-announces-cidade-de-rio-das-ostras-fpso-contr Teekay Announces Cidade De Rio Das Ostras FPSO Contract Extension] | # [http://killajoules.wikidot.com/archive:teekay-announces-cidade-de-rio-das-ostras-fpso-contr Teekay Announces Cidade De Rio Das Ostras FPSO Contract Extension] | ||
− | # [ Petrobras signs contracts for sale of shallow water assets in a total of US$ 1.5 billion] | + | # [https://abarrelfull.blogspot.com/2021/12/petrobras-signs-contracts-for-sale-of.html Petrobras signs contracts for sale of shallow water assets in a total of US$ 1.5 billion] |
Revision as of 11:49, 9 December 2021
Summary Information
- Operator: Petrobras
- Country: Brazil
- Location: Campos Basin
- Production start: 2008
- Partners:
- Type: Heavy Oil
- Estimated Reserves:
- Production Volume:
+++ Description
- The Siri reservoir contains a very heavy oil of 13 API and the operating temperature is set to be 140 oC,
- The Petrojarl Cidade De Rio Das Ostras FPSO was located on the field
+++ Contractors
- -
+++ History
- 2008 - First oil produced
- 2010 - Petrojarl Cidade De Rio Das Ostras FPSO relocated
+++ Geology