Difference between revisions of "Badejo-Siri Oil Field"

From A Barrel Full
Jump to navigation Jump to search
Line 26: Line 26:
 
# [http://killajoules.wikidot.com/archive:aibel-wins-breakthrough-pilot-contract-for-new-techn Aibel wins breakthrough pilot contract for new technologies]
 
# [http://killajoules.wikidot.com/archive:aibel-wins-breakthrough-pilot-contract-for-new-techn Aibel wins breakthrough pilot contract for new technologies]
 
# [http://killajoules.wikidot.com/archive:teekay-announces-cidade-de-rio-das-ostras-fpso-contr Teekay Announces Cidade De Rio Das Ostras FPSO Contract Extension]
 
# [http://killajoules.wikidot.com/archive:teekay-announces-cidade-de-rio-das-ostras-fpso-contr Teekay Announces Cidade De Rio Das Ostras FPSO Contract Extension]
# [ Petrobras signs contracts for sale of shallow water assets in a total of US$ 1.5 billion]
+
# [https://abarrelfull.blogspot.com/2021/12/petrobras-signs-contracts-for-sale-of.html Petrobras signs contracts for sale of shallow water assets in a total of US$ 1.5 billion]

Revision as of 11:49, 9 December 2021

Summary Information

  • Operator: Petrobras
  • Country: Brazil
  • Location: Campos Basin
  • Production start: 2008
  • Partners:
  • Type: Heavy Oil
  • Estimated Reserves:
  • Production Volume:

+++ Description

+++ Contractors

  • -

+++ History

+++ Geology

Links

  1. Aibel wins breakthrough pilot contract for new technologies
  2. Teekay Announces Cidade De Rio Das Ostras FPSO Contract Extension
  3. Petrobras signs contracts for sale of shallow water assets in a total of US$ 1.5 billion