Difference between revisions of "Western Isles Oil Fields, Barra and Harris"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Dana * Country: UK * Location: Northern North Sea, 160km east of the Shetlands * Production start: 2017 * Partners: Itochu * Type: Oil * Estim...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Dana | * Operator: Dana | ||
* Country: UK | * Country: UK | ||
Line 9: | Line 9: | ||
* Production Volume: Plateau production is expected to be around 40,000 boepd | * Production Volume: Plateau production is expected to be around 40,000 boepd | ||
− | + | === Description === | |
* The Western Isles Development is producing from two oil fields called Harris and Barra in the Northern North Sea, 160km east of the Shetlands and 12km west of Tern field. | * The Western Isles Development is producing from two oil fields called Harris and Barra in the Northern North Sea, 160km east of the Shetlands and 12km west of Tern field. | ||
* It involves a subsea development of production and water injection wells tied back to a the [[Western Isles FPSO]] with oil export using shuttle tankers. | * It involves a subsea development of production and water injection wells tied back to a the [[Western Isles FPSO]] with oil export using shuttle tankers. | ||
− | + | === Contractors === | |
* **COSCO:** Construction of the FPSO | * **COSCO:** Construction of the FPSO | ||
* **Sevan Marine:** Technology Licence for the cylindrically shaped FPSO | * **Sevan Marine:** Technology Licence for the cylindrically shaped FPSO | ||
Line 19: | Line 19: | ||
* '''Diamond Offshore''': Drilling of production wells | * '''Diamond Offshore''': Drilling of production wells | ||
− | + | === History === | |
* 2012 - Dana Petroleum started the detailed engineering design phase for the project | * 2012 - Dana Petroleum started the detailed engineering design phase for the project | ||
* 2012 - The Department of Energy and Climate Change has approved the development of the field | * 2012 - The Department of Energy and Climate Change has approved the development of the field | ||
Line 27: | Line 27: | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [http://www.dana-petroleum.com/Global/PDFs/Misc/WIDP%20Fact%20Sheet.pdf Western Isles Development Project] | # [http://www.dana-petroleum.com/Global/PDFs/Misc/WIDP%20Fact%20Sheet.pdf Western Isles Development Project] | ||
# [http://killajoules.wikidot.com/blog:2814 Dana Petroleum’s Western Isles project moves ahead] | # [http://killajoules.wikidot.com/blog:2814 Dana Petroleum’s Western Isles project moves ahead] | ||
Line 39: | Line 39: | ||
# [http://killajoules.wikidot.com/blog:5130 Dana Petroleum’s Western Isles Project first well successfully tested] | # [http://killajoules.wikidot.com/blog:5130 Dana Petroleum’s Western Isles Project first well successfully tested] | ||
# [http://killajoules.wikidot.com/blog:5184 Dana Petroleum’s Western Isles Project gas export pipeline successfully installed] | # [http://killajoules.wikidot.com/blog:5184 Dana Petroleum’s Western Isles Project gas export pipeline successfully installed] | ||
+ | # [ Dana Petroleum announces first oil from Western Isles] | ||
Revision as of 16:30, 2 December 2021
Summary Information
- Operator: Dana
- Country: UK
- Location: Northern North Sea, 160km east of the Shetlands
- Production start: 2017
- Partners: Itochu
- Type: Oil
- Estimated Reserves:
- Production Volume: Plateau production is expected to be around 40,000 boepd
Description
- The Western Isles Development is producing from two oil fields called Harris and Barra in the Northern North Sea, 160km east of the Shetlands and 12km west of Tern field.
- It involves a subsea development of production and water injection wells tied back to a the Western Isles FPSO with oil export using shuttle tankers.
Contractors
- **COSCO:** Construction of the FPSO
- **Sevan Marine:** Technology Licence for the cylindrically shaped FPSO
- **Subsea 7:** Engineering, procurement, construction and installation of two 2.5 kilometer pipeline bundles and a 11 kilometer gas export pipeline
- Diamond Offshore: Drilling of production wells
History
- 2012 - Dana Petroleum started the detailed engineering design phase for the project
- 2012 - The Department of Energy and Climate Change has approved the development of the field
- 2013 - Subsea 7 awarded pipeline contract
- 2013 - Dana starts drilling operations
- 2014 - Production wells tested & Export pipeline installed
Geology
Links
- Western Isles Development Project
- Dana Petroleum’s Western Isles project moves ahead
- Dana $1.6bn oil and gas development gets go ahead
- Western Isles License- and Service Agreements Signed
- Subsea 7 S.A. awarded US$300 million North Sea contract
- Dana starts drilling operations on Western Isles project ahead of schedule
- Dana Petroleum’s Western Isles Project first well successfully tested
- Dana Petroleum’s Western Isles Project gas export pipeline successfully installed
- [ Dana Petroleum announces first oil from Western Isles]