Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: GDF Suez * Country: UK * Location: 40 kilometers East of the Humberside estuary * Production start: 2014 * Partners: GDF SUEZ (51.56%)...") |
Abarrelfull (talk | contribs) (→Links) |
||
Line 37: | Line 37: | ||
# [http://killajoules.wikidot.com/blog:3669 Technip awarded contract by GDF SUEZ E&P UK for the Juliet project] | # [http://killajoules.wikidot.com/blog:3669 Technip awarded contract by GDF SUEZ E&P UK for the Juliet project] | ||
# [http://killajoules.wikidot.com/blog:5083 GDF SUEZ E&P raises its hydrocarbon production with multiple start ups in the North Sea] | # [http://killajoules.wikidot.com/blog:5083 GDF SUEZ E&P raises its hydrocarbon production with multiple start ups in the North Sea] | ||
+ | # [ Neptune Energy uses innovative technology for decommissioning work ] |
Revision as of 09:00, 1 December 2021
Summary Information
- Operator: GDF Suez
- Country: UK
- Location: 40 kilometers East of the Humberside estuary
- Production start: 2014
- Partners: GDF SUEZ (51.56%), First Oil Expro Limited (29.44%) and Hansa Hydrocarbons Limited (19%)
- Type: Gas
- Estimated Reserves: Gross 2P reserves amount to 2 billion cubic metres
- Production Volume:
+++ Description
- Juliet, located 39 km east of the Lincolnshire coastline received sanction in June 2012 and will be operated by GDF SUEZ (51.56%) in partnership with First Oil Expro Limited (29.44%) and Hansa Hydrocarbons Limited (19%).
- First gas is scheduled for late 2013 and gross 2P reserves amount to 2 billion cubic metres
- The Juliet development will comprise two horizontal subsea wells tied back some 22 km to the Pickerill A platform, on the [[[Pickerill Gas Field]]], operated by Perenco UK Ltd. Existing infrastructure will then transport the Juliet gas to the Theddlethorpe terminal on the Lincolnshire coast.
+++ Contractors
- **Technip:** Engineering, procurement, installation and construction for tie back
- **Xodus Group:** Front end engineering and design (FEED) study
+++ History
- 2008 - Juliet exploration drilling successful
- 2010 - Hansa acquired a stake from First Oil Expro
- 2012 - UK government approval given
- 2012 - Investment decision taken
- 2013 - Technip awarded tie back contract
- 2014 - First gas produced
+++ Geology
Links
- UK Oil and Gas Fields by Approval Date
- Successful Southern North Sea exploration well
- Hansa Hydrocarbons acquires interest in Southern North Sea development project
- Xodus Group wins subsea FEED contract for Juliet field
- GDF SUEZ to operate two new gas fields in the North Sea: Juliet and Cygnus, UK’s largest gas discovery in last 25 years
- Technip awarded contract by GDF SUEZ E&P UK for the Juliet project
- GDF SUEZ E&P raises its hydrocarbon production with multiple start ups in the North Sea
- [ Neptune Energy uses innovative technology for decommissioning work ]