Difference between revisions of "Jasmine Gas and Condensate Field"

From A Barrel Full
Jump to navigation Jump to search
Line 13: Line 13:
 
* It is part of the J-Block first round licence awarded in 1964 and is the fourth development in the J-Area after Judy, Joanne and Jade.  
 
* It is part of the J-Block first round licence awarded in 1964 and is the fourth development in the J-Area after Judy, Joanne and Jade.  
 
* The development consisting of a 24-slot wellhead platform (JWHP) with bridge-linked accommodation, came onstream in 2013. The JWHP is tied back to the [[Judy, Joanne and Jade Gas and Condensate Fields | Judy platform]] to the east via an 8-kilometre pipeline and a riser platform at Judy. Production from Jasmine is processed and exported through Judy.
 
* The development consisting of a 24-slot wellhead platform (JWHP) with bridge-linked accommodation, came onstream in 2013. The JWHP is tied back to the [[Judy, Joanne and Jade Gas and Condensate Fields | Judy platform]] to the east via an 8-kilometre pipeline and a riser platform at Judy. Production from Jasmine is processed and exported through Judy.
* From [[Judy Joanne And Jade Gas And Condensate Fields | Judy]], gas is trasported via the [[CATS Central Area Transmission System Gas Pipeline]] to the [[Teesside Gas Processing Plant TGPP]]
+
* From [[Judy, Joanne And Jade Gas And Condensate Fields | Judy]], gas is trasported via the [[CATS Central Area Transmission System Gas Pipeline]] to the [[Teesside Gas Processing Plant TGPP]]
  
 
=== Contractors ===
 
=== Contractors ===

Revision as of 22:40, 30 November 2021

Summary Information

  • Operator: ConocoPhillips
  • Country: UK
  • Location: blocks P011 and P0032 30/7a, Central North Sea
  • Production start: 2013
  • Partners: ConocoPhillips - 36.5, BG Group - 30.5%, ENI - 33.0%
  • Type: Gas And Condensate
  • Estimated Reserves: recoverable reserves are estimated at around 170 mmboe
  • Production Volume:

Description

  • Jasmine is a high pressure, high temperature (HP/HT) gas condensate field located in Blocks 30/6 and 30/7 of the UK central North Sea approximately 255 kilometres south east of Aberdeen.
  • It is part of the J-Block first round licence awarded in 1964 and is the fourth development in the J-Area after Judy, Joanne and Jade.
  • The development consisting of a 24-slot wellhead platform (JWHP) with bridge-linked accommodation, came onstream in 2013. The JWHP is tied back to the Judy platform to the east via an 8-kilometre pipeline and a riser platform at Judy. Production from Jasmine is processed and exported through Judy.
  • From Judy, gas is trasported via the CATS Central Area Transmission System Gas Pipeline to the Teesside Gas Processing Plant TGPP

Contractors

  • **Halliburton:** Directional drilling, logging-while-drilling (LWD) and surface data logging (SDL) services
  • **Dragados Offshore:** Constructability analysis, construction engineering, partial purchases, construction, commissioning, load out and sea fastening of two decks
  • **WorleyParsons:** Detailed engineering for three platforms, interconnecting bridges, pipe-in-pipe risers and spools along with the functional design and specification for the subsea pipeline, subsea isolation valves, power/communications cable and umbilicals
  • **Subsea 7:** Engineering, procurement, fabrication, installation and commissioning of two approximately 4km pipeline bundle systems and associated pipe-in-pipe spools
  • **AMEC:** Detailed engineering and procurement the existing Judy platform and the hook-up and commissioning of their new Jasmine facilities
  • **Rosetti Marino:**
* Procurement, Construction and Commissioning of Topsides for the Jasmine platform
* Construction engineering, procurement, fabrication, load-out and sea-fastening of JASMINE WHP, JLQ & JRP substructures
  • **IKM Testing:** Pressure Tests, Bolt Tensioning & Torquing, Hot Oil Flushing, Cleaning, Video Inspection, Test Engineering, Drying & N2 Purging
  • **Saipem:** Wellhead, accomodation and process platforms
  • **FoundOcean:** Grouting for Jasmine Living Quarters & WHP
  • **KWSubsea:** Pipeline Concept Engineering Services

History

  • 2006 - Jasmine Gas And Condensate Field discovered
  • 2010 - WorleyParsons awarded Detailed engineering contract
  • 2010 - Halliburton awarded drilling contract
  • 2010 - Dragados Offshore awarded deck contract
  • 2013 - First gas produced
  • 2017 - Chrysaor acquired Shell's stake in the field.

Geology

Links

  1. Central North Sea, ConocoPhillips
  2. [[[List Of Oil and Gas Production Platforms In The UK]]]
  3. [[[Saipem Fixed Offshore Production Facilities Project References]]]
  4. [[[FoundOcean Subsea References]]]
  5. [[[KWSubsea Subsea References]]]
  6. [[[Rosetti Marino Platform References]]]
  7. BG Group announce substantial North Sea discovery
  8. Subsea 7 Confirms Contract for ConocoPhillips Jasmine Discovery in the North Sea
  9. IKM Testing Spain awarded a new contract
  10. Halliburton Wins Contract for Jasmine
  11. Award by ConocoPhillips for Jasmine Area Development
  12. AMEC awarded Judy and Jasmine contract North Sea
  13. Conocophilips Awards A New Contract To Dragados Offshore
  14. First gas production from UK Jasmine field
  15. Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn