Difference between revisions of "Erskine Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Chevron * Country: UK * Location: central North Sea * Production start: 1997 * Partners: * Type: Oil & Gas * Estimated Reserves: * Production...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Chevron | * Operator: Chevron | ||
* Country: UK | * Country: UK | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
− | * | + | * Erskine is a complex high pressure/high-temperature (HP/HT) gas/condensate field located in Block 23/26b of the UK Central North Sea. |
* The field utilises a small steel normally unmanned platform | * The field utilises a small steel normally unmanned platform | ||
− | * Gas and liquids produced from the Erskine field are processed on the | + | * Gas and liquids produced from the Erskine field are processed on the [[Lomond Oil And Gas Field | Lomond platform]], with gas then transported via the [[CATS Central Area Transmission System Gas Pipeline]] and liquids via [[Forties Pipeline System]]. |
− | + | === Contractors === | |
* **Lewis Offshore:** Platform Construction | * **Lewis Offshore:** Platform Construction | ||
* **Saipem:** | * **Saipem:** | ||
− | + | ** Platform Jacket EPIC | |
− | + | ** Pipelines T&I | |
* **McNulty:** Module construction | * **McNulty:** Module construction | ||
* **McDermott-ETPM:** Erskine to Lomond installation | * **McDermott-ETPM:** Erskine to Lomond installation | ||
Line 24: | Line 24: | ||
* **J P Kenny:** Review of the hydrate mitigation strategy for all anticipated operating scenarios | * **J P Kenny:** Review of the hydrate mitigation strategy for all anticipated operating scenarios | ||
− | + | === History === | |
* 1995 - Texaco receives approval for the project | * 1995 - Texaco receives approval for the project | ||
* 1997 - First production | * 1997 - First production | ||
Line 30: | Line 30: | ||
* 2017 - Chrysaor acquired Shell's stake in the field. | * 2017 - Chrysaor acquired Shell's stake in the field. | ||
− | + | === Geology === | |
* | * | ||
Revision as of 18:10, 30 November 2021
Summary Information
- Operator: Chevron
- Country: UK
- Location: central North Sea
- Production start: 1997
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- Erskine is a complex high pressure/high-temperature (HP/HT) gas/condensate field located in Block 23/26b of the UK Central North Sea.
- The field utilises a small steel normally unmanned platform
- Gas and liquids produced from the Erskine field are processed on the Lomond platform, with gas then transported via the CATS Central Area Transmission System Gas Pipeline and liquids via Forties Pipeline System.
Contractors
- **Lewis Offshore:** Platform Construction
- **Saipem:**
- Platform Jacket EPIC
- Pipelines T&I
- **McNulty:** Module construction
- **McDermott-ETPM:** Erskine to Lomond installation
- **BiFab:** Tie-In Spools
- **J P Kenny:** Review of the hydrate mitigation strategy for all anticipated operating scenarios
History
- 1995 - Texaco receives approval for the project
- 1997 - First production
- 2009 - BG Group acquired a stake from BP
- 2017 - Chrysaor acquired Shell's stake in the field.
Geology
Links
- UK Oil and Gas Fields by Approval Date]
- List Of Oil Production Platforms In The UK
- List Of Oil and Gas Production Platforms In The UK
- BiFab Subsea References
- J P Kenny Subsea References
- Serimax Pipeline References
- Saipem Europe Pipeline References
- International Protective Coatings Platform References
- Saipem Fixed Offshore Production Facilities Project References
- BG Group completes UK North Sea asset exchange with BP
- Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn