* The development plan for Yellowtail includes up to three drill shipsdrilling up to 67 wells, a Floating Production, Storage, and Offloading Vessel (FPSO) and Subsea, Umbilicals, Risers, and Flowlines (SURF) production system, with tankers taking the oil to global markets
+
* The development plan for Yellowtail includes up to three drill ships drilling up to 67 wells, a Floating Production, Storage, and Offloading Vessel (FPSO) and Subsea, Umbilicals, Risers, and Flowlines (SURF) production system, with tankers taking the oil to global markets
 +
* This project will develop both the Yellowtail and Redtail fields
  
 
=== Contractors ===
 
=== Contractors ===

Revision as of 09:19, 22 November 2021

Summary Information

  • Operator: Exxon
  • Country:
  • Location:
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The development plan for Yellowtail includes up to three drill ships drilling up to 67 wells, a Floating Production, Storage, and Offloading Vessel (FPSO) and Subsea, Umbilicals, Risers, and Flowlines (SURF) production system, with tankers taking the oil to global markets
  • This project will develop both the Yellowtail and Redtail fields

Contractors

  • TechnipFMC - Project management, engineering, manufacturing and testing capabilities to deliver the overall subsea production system. The scope of the project includes 51 enhanced vertical deepwater trees (EVDT) and associated tooling, as well as 12 manifolds and associated controls and tie-in equipment.

History

Geology

Links

  1. TechnipFMC Awarded Large Subsea Contract for Additional Stabroek Block project