Difference between revisions of "Sociedad Portuaria el Cayao Cartagena Colombia LNG Import Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 7: | Line 7: | ||
* Status: | * Status: | ||
=== Brief Description === | === Brief Description === | ||
+ | * The LNG import facility consists of an LNG jetty, onshore infrastructure and a 9.2 km gas pipeline which connects SPEC to the national gas grid. A chartered FSRU is receiving the LNG and sending the gas on shore. | ||
+ | . | ||
=== Technical Details === | === Technical Details === |
Revision as of 13:43, 24 August 2020
Contents
Summary Information
- Ownership:
- Website:
- Location:
- Capacity: million tons/annum
- Status:
Brief Description
- The LNG import facility consists of an LNG jetty, onshore infrastructure and a 9.2 km gas pipeline which connects SPEC to the national gas grid. A chartered FSRU is receiving the LNG and sending the gas on shore.
.
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
- Licensor:
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2016 - The terminal began operating
- 2019 - Vopak acquired a 49% stake
Other Information
-