Difference between revisions of "Volgograd Refinery Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 13: | Line 13: | ||
=== The Project === | === The Project === | ||
| − | Project Type: Upgrade | + | * Project Type: Upgrade |
| − | Project Summary: | + | * Project Summary: |
| − | Construction of delayed coking unit with annual capacity of 1 mln tons (to be commissioned during 2011) | + | ** Construction of delayed coking unit with annual capacity of 1 mln tons (to be commissioned during 2011) |
| − | Construction of a unit for hydrotreatment of diesel fuel by 2011 | + | ** Construction of a unit for hydrotreatment of diesel fuel by 2011 |
| − | Construction of a hydrocracker complex | + | ** Construction of a hydrocracker complex |
| − | Construction of a FCC unit by 2015 | + | ** Construction of a FCC unit by 2015 |
| − | === Main Contractors | + | === Main Contractors === |
| − | Técnicas Reunidas: | + | * Técnicas Reunidas: |
| − | Front End Engineering and Design (FEED) of a hydrocracker complex | + | ** Front End Engineering and Design (FEED) of a hydrocracker complex |
| − | Engineering and supply of the equipment and materials, construction, pre-commissioning as well as support for commissioning of hydrocracker complex | + | ** Engineering and supply of the equipment and materials, construction, pre-commissioning as well as support for commissioning of hydrocracker complex |
| − | VNIPIneft won the tender and signed a contract to design the distillation column | + | * VNIPIneft won the tender and signed a contract to design the distillation column |
| − | === Refining Units | + | === Refining Units === |
| − | hydrocracker complex - 3.5 Million tpa | + | * hydrocracker complex - 3.5 Million tpa |
| − | Delayed Coker - Will replace 2 existing obsolete units | + | * Delayed Coker - Will replace 2 existing obsolete units |
| − | Fluidised Catalytic Cracker - 1.5 Million tpa | + | * Fluidised Catalytic Cracker - 1.5 Million tpa |
| − | Diesel Hydrotreatment | + | * Diesel Hydrotreatment |
| − | === Terminal Capacity | + | === Terminal Capacity === |
| − | Crude Oil: | + | * Crude Oil: |
| − | Refined Products: | + | * Refined Products: |
| − | === Crude Supply | + | === Crude Supply === |
| − | Refines a blend of light West Siberian and Lower Volga crudes | + | * Refines a blend of light West Siberian and Lower Volga crudes |
| − | Products Produced | + | === Products Produced === |
| − | The project | + | * The project increased the proportion of light products |
| − | The project | + | * The project increased the output of Euro-5 diesel fuel by 2,4 million tonnes per year |
| + | |||
=== History === | === History === | ||
2011 - Tecnicas Reunidas awarded the FEED for the hydrocracker complex | 2011 - Tecnicas Reunidas awarded the FEED for the hydrocracker complex | ||
Revision as of 18:54, 19 March 2020
Contents
Summary Information
- Ownership: Lukoil
- Website: http://www.lukoil.com/
- List of Lukoil Refineries
- Wiki Page: Volgograd Refinery
- Location: Volvograd, Southern Russia
- Capacity:
- Before: 11.25 million tons/annum & 225.000 bbl/day
- After: 14.5 million tons/annum & 290.000 bbl/day
- Nelson Complexity: 6.9
- Project Stage: Completed 2016
- Budget:
The Project
- Project Type: Upgrade
- Project Summary:
- Construction of delayed coking unit with annual capacity of 1 mln tons (to be commissioned during 2011)
- Construction of a unit for hydrotreatment of diesel fuel by 2011
- Construction of a hydrocracker complex
- Construction of a FCC unit by 2015
Main Contractors
- Técnicas Reunidas:
- Front End Engineering and Design (FEED) of a hydrocracker complex
- Engineering and supply of the equipment and materials, construction, pre-commissioning as well as support for commissioning of hydrocracker complex
- VNIPIneft won the tender and signed a contract to design the distillation column
Refining Units
- hydrocracker complex - 3.5 Million tpa
- Delayed Coker - Will replace 2 existing obsolete units
- Fluidised Catalytic Cracker - 1.5 Million tpa
- Diesel Hydrotreatment
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- Refines a blend of light West Siberian and Lower Volga crudes
Products Produced
- The project increased the proportion of light products
- The project increased the output of Euro-5 diesel fuel by 2,4 million tonnes per year
History
2011 - Tecnicas Reunidas awarded the FEED for the hydrocracker complex 2011 - Construction of the delayed coker completed 2013 - Técnicas Reunidas awarded EPC contract for the hydrocracker complex
Other Information
-
Links
- Oil Refining in Russia. Majors Plan Upgrades to Raise Product Quality
- Técnicas Reunidas awarded a Project in Russia and another in Turkey
- LUKoil finished building a delayed coking unit at the Volgograd Refinery
- Design Installation ELOU-AVT-6 OAO LUKOIL-Volgogradneftepererabotka
- LUKOIL refineries development strategy
- Lukoil Launches A Major Modernization Project At Volgograd Refinery
- Técnicas Reunidas has been awarded a major contract for the Lukoil´s refinery in Volgodgrad, Russia