Difference between revisions of "Buna SOW Leuna Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 27: | Line 27: | ||
=== Other Information === | === Other Information === | ||
* The refinery replaced the two outdated refineries of Leuna and Zeitz | * The refinery replaced the two outdated refineries of Leuna and Zeitz | ||
− | === History | + | === History === |
* 1997 - The TOTAL refinery went into operation after three years of construction | * 1997 - The TOTAL refinery went into operation after three years of construction | ||
* 2007 - Kerosene hydro-desulphurization project launched | * 2007 - Kerosene hydro-desulphurization project launched | ||
* 2014 - Revamp of alkylation plant completed | * 2014 - Revamp of alkylation plant completed | ||
− | === Links | + | === Links === |
# [http://www.total.de/de/totalde.nsf/VS_OPM/8EB1DDCEFCDB463CC125760E0047BB29?OpenDocument Refinery Web Page] (German) | # [http://www.total.de/de/totalde.nsf/VS_OPM/8EB1DDCEFCDB463CC125760E0047BB29?OpenDocument Refinery Web Page] (German) | ||
# [http://uk.reuters.com/article/idUKLR7345820090310 FACTBOX-Total's European refineries] | # [http://uk.reuters.com/article/idUKLR7345820090310 FACTBOX-Total's European refineries] |
Revision as of 09:26, 18 February 2020
Contents
Summary Information
- Ownership: Total
- Website: http://www.total.com/
- List of Total Refineries
- Location: Saxony-Anhalt
- Capacity: 12 million tons/annum & 240.000 bbl/day
- Nelson Complexity: 6.4
Refining Units
- Crude distillation unit: 230,000
- vacuum distillation units: 110,000
- Alkylation Unit
- catalytic reforming unit: 20,000
- hydrogeneration cracker: 74,000
- Hydrocracker:
- catalytic cracker unit: 60,000
- visbreaker unit: 28,800
- Diesel Desulphurisation
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- Crude oil is supplied through the Druzhba Pipeline from Russia
Products Produced
- Gasoline, Diesel, Heating Oil
Projects
- A decision was made in 2007 to build a new desulphurisation unit in the Leuna refinery in order to supply the German market with low-sulphur heating oil.
Other Information
- The refinery replaced the two outdated refineries of Leuna and Zeitz
History
- 1997 - The TOTAL refinery went into operation after three years of construction
- 2007 - Kerosene hydro-desulphurization project launched
- 2014 - Revamp of alkylation plant completed