Difference between revisions of "Hazira LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
| − | + | === Summary Information === | |
* Ownership: Hazira LNG, (Shell / Total) | * Ownership: Hazira LNG, (Shell / Total) | ||
| Line 8: | Line 8: | ||
* Status: In Operation | * Status: In Operation | ||
| − | + | === Brief Description === | |
* Hazira LNG Terminal is designed as a 5 million ton import terminal | * Hazira LNG Terminal is designed as a 5 million ton import terminal | ||
* It is a merchant terminal, depending on short term contracts rather than long term agreements, making its sourcing more flexible | * It is a merchant terminal, depending on short term contracts rather than long term agreements, making its sourcing more flexible | ||
| − | + | === Technical Details === | |
* Storage capacity: Two cryogenic tanks each with a net capacity of 160,000 m3 each | * Storage capacity: Two cryogenic tanks each with a net capacity of 160,000 m3 each | ||
* Unloading capacity: | * Unloading capacity: | ||
| Line 25: | Line 25: | ||
| − | + | === Ongoing Projects/Project Status === | |
* The project is designed to be expandable to 5 million tons capacity | * The project is designed to be expandable to 5 million tons capacity | ||
* It is currently undergoing expansion which will be completed in 2012 | * It is currently undergoing expansion which will be completed in 2012 | ||
* In addition, there is potential to expanded to 10 million tons | * In addition, there is potential to expanded to 10 million tons | ||
| − | + | === Suppliers / Customers === | |
* Suppliers: Suppliers include the [[North-West Shelf LNG]] in Australia, and spot cargoes | * Suppliers: Suppliers include the [[North-West Shelf LNG]] in Australia, and spot cargoes | ||
* Customers: Connected to the local grid, to serve both industrial and domestic customers. | * Customers: Connected to the local grid, to serve both industrial and domestic customers. | ||
| − | + | === History === | |
* 2005 - Terminal commences operations | * 2005 - Terminal commences operations | ||
* 2011 - The terminal recieves the first cargo from [[Qatargas 4 Ras Laffan Lng Terminal | Qatargas 4]] | * 2011 - The terminal recieves the first cargo from [[Qatargas 4 Ras Laffan Lng Terminal | Qatargas 4]] | ||
| − | + | === Other Information === | |
* - | * - | ||
| − | + | === Links === | |
# [http://www.shell.com/home/content/ind/aboutshell/shell_businesses/india_business_structure/hazira_lng/ Information from Shell] | # [http://www.shell.com/home/content/ind/aboutshell/shell_businesses/india_business_structure/hazira_lng/ Information from Shell] | ||
# [http://www.shell.com/home/content/media/news_and_media_releases/archive/2005/lng_from_hazira_21042005.html Shell venture sells first regasified LNG from Hazira terminal in India] | # [http://www.shell.com/home/content/media/news_and_media_releases/archive/2005/lng_from_hazira_21042005.html Shell venture sells first regasified LNG from Hazira terminal in India] | ||
# [http://www.foxbusiness.com/industries/2011/11/03/shell-total-to-expand-india-lng-terminal-capacity-in-2012/ Shell, Total To Expand India LNG Terminal Capacity In 2012] | # [http://www.foxbusiness.com/industries/2011/11/03/shell-total-to-expand-india-lng-terminal-capacity-in-2012/ Shell, Total To Expand India LNG Terminal Capacity In 2012] | ||
| + | # [[Punj Lloyd Pipeline References]] | ||
| + | # [[Saipem LNG References]] | ||
# [[Tractebel Engineering LNG References]] | # [[Tractebel Engineering LNG References]] | ||
| − | |||
# [http://killajoules.wikidot.com/blog:546 Qatargas and Shell send first Qatargas 4 cargo to India] | # [http://killajoules.wikidot.com/blog:546 Qatargas and Shell send first Qatargas 4 cargo to India] | ||
Latest revision as of 16:03, 28 January 2026
Contents
Summary Information
- Ownership: Hazira LNG, (Shell / Total)
- Website: http://www.haziralng.com/
- List of Shell LNG Terminals
- Location: Hazira, Gujarat, India
- Capacity: 2.5 million tons/annum
- Status: In Operation
Brief Description
- Hazira LNG Terminal is designed as a 5 million ton import terminal
- It is a merchant terminal, depending on short term contracts rather than long term agreements, making its sourcing more flexible
Technical Details
- Storage capacity: Two cryogenic tanks each with a net capacity of 160,000 m3 each
- Unloading capacity:
- Send out capacity:
- Constructor:
- Designed by Shell Global Solutions (SGSI)
- Managing Contractors – SN Technigaz/Bouygues Offshore Technimont ICB (French – Italian Consortium)
- Tanks – Punj Lloyd Limited
- Causeway and spurs – Larsen &Toubro Jetty -
- Afcons Civil Building – Simplex
- **Tractebel Engineering:** Executing FEED, EPC ITB & selection of EPC Contractor and Owner's Engineering services for the expansion
Ongoing Projects/Project Status
- The project is designed to be expandable to 5 million tons capacity
- It is currently undergoing expansion which will be completed in 2012
- In addition, there is potential to expanded to 10 million tons
Suppliers / Customers
- Suppliers: Suppliers include the North-West Shelf LNG in Australia, and spot cargoes
- Customers: Connected to the local grid, to serve both industrial and domestic customers.
History
- 2005 - Terminal commences operations
- 2011 - The terminal recieves the first cargo from Qatargas 4
Other Information
- -