Difference between revisions of "Nord-West Oelleitung Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 24: | Line 24: | ||
* 1956 - Company formed | * 1956 - Company formed | ||
* 1958 - Pipeline commissioned | * 1958 - Pipeline commissioned | ||
+ | * 2025 - BP announced that it was looking for a buyer | ||
=== Other Information === | === Other Information === |
Latest revision as of 16:29, 13 March 2025
Summary Information
- Source: Wilhelmshaven
- Destination: Köln
- Ownership: Nord West Oelleitung Gmbh
- Website: https://nwowhv.de/en/home/
- Length: 391 kilometres ( miles)
- Capacity: 320,000 barrels of oil per day
- Crude Type:
The Route
- NWO’s pipeline measures 28 inches in diameter and is 391 km long with its branch pipelines included.
- The pipeline source is a tank farm in Wilhelmshaven, on the Baltic coast.
- The pipeline runs from North to South, bringing crude oil to refineries in the West of Germany.
- Refineries supplied by the pipeline are:
Pipeline Status
- In operation
History
- 1956 - Company formed
- 1958 - Pipeline commissioned
- 2025 - BP announced that it was looking for a buyer