* 2013 - Subsea 7 Wins Pipeline Bundle Project  | * 2013 - Subsea 7 Wins Pipeline Bundle Project  | ||
* 2016 - New platform installed  | * 2016 - New platform installed  | ||
| + | * 2017 - First oil from the Montrose Area Redevelopment (MAR) project (Shaw)  | ||
=== Geology ===  | === Geology ===  | ||
Revision as of 06:31, 10 July 2024
Contents
Summary Information
- Operator: Talisman
 - Country: UK
 - Location: Central North Sea
 - Production start:
 - Partners: Marubeni
 - Type: Oil / Gas
 - Estimated Reserves:
 - Production Volume:
 
Description
- The fields are operated using two small manned steel platforms, Montrose A & Arbroath
 - The £1.6 billion MonArb Area Redevelopment Project will mean the production of a further 100 million barrels of oil equivalent from the existing Montrose, Arbroath, Brechin, Arkwright, Carnoustie and Wood fields.
 - The project also includes consent for the new Cayley, Godwin and Shaw fields.
 
Contractors
- **Union Industrielle et d’Enterprise (UIE):** Montrose Platform
 - **Highlands Fabricators:** Arbroath Platform
 - **HSM Offshore:**
- Montrose Living Quarter
 - WaGE Compression and Treatment Module
 
 - **Stolt Offshore:** A 10-inch, 8.5km water injection line between the Montrose and Arbroath platforms
 - **Heerema Marine Contractors:** Arbroath T&I
 
Montrose Area Redevelopment (MAR) Project
- **Subsea 7:** Project management, engineering, procurement, fabrication and installation of two 5km pipeline bundles
 - **Offshore Group Newcastle Limited:** Engineering, procurement and fabrication of the jacket
 - **AMEC:** FEED (front end engineering design) for the new bridge-linked platform brownfield scope and upgrade of the existing Montrose Alpha platform
 - **OGN:** Engineering, procurement and fabrication of the oil and gas jacket, for the new bridge-linked platform for the Montrose Area Redevelopment (MAR) Project.
 - **KWsubsea:** Assessment of HPHT Pipelines for Shaw and Cayley
 
History
- 1976 - Montrose development approval given
 - 1987 - Arbroath development approval given
 - 1989 - Arbroath platform installed
 - 1995 - Approval granted for Arkwright
 - 2005 - Talisman acquires Paladin, becoming the operator of the field
 - 2006 - Wood and Gas Export (WaGE) module installed on the Montrose platform
 - 2007 - First production from the Wood field
 - 2009 - Cayley, Godwin and Shaw fields discovered
 - 2012 - Montrose Area Redevelopment approved
 - 2013 - Subsea 7 Wins Pipeline Bundle Project
 - 2016 - New platform installed
 - 2017 - First oil from the Montrose Area Redevelopment (MAR) project (Shaw)
 
Geology
Links
- List Of Oil Production Platforms In The UK
 - List Of Oil and Gas Production Platforms In The UK
 - HSM Offshore Platform References
 - FoundOcean Europe Subsea References
 - Serimax Pipeline References
 - KWsubsea High Pressure High Temperature Systems References
 - Stolt Offshore Announces $120 Million of Contract Awards in the North Sea
 - Talisman to Acquire Paladin Resources Plc for Pounds Sterling 1,218 Million 'C$2,521 Million'
 - Marubeni announce oil discovery in UK Central North Sea
 - Petrofac Brownfield Secures WaGE Project
 - WaGE Meets Major Milestones
 - Talisman Energy Announces First Production From the Wood Field in the North Sea
 - Brown Field Allowance sparks new wave of oil investment
 - AMEC awarded a five-year brownfield topside projects contract by Talisman Energy (UK) Limited
 - Subsea 7 UK & Canada Wins Pipeline Bundle Project for Talisman Sinopec UK Energy’s Montrose Area Redevelopment Project
 - OGN awarded Multi-Million Pound Talisman Jacket Contract
 - New Montrose Platform Successfully Installed
 - First Oil Confirmed From Montrose Area Redevelopment