Difference between revisions of "West Sole Area Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 19: | Line 19: | ||
=== History === | === History === | ||
* 1967 - Approval granted for development | * 1967 - Approval granted for development | ||
+ | * 1993 - Hyde Platform installed | ||
* 2001 - Approval granted for Hoton | * 2001 - Approval granted for Hoton | ||
* 2012 - Perenco acquired the fields from BP | * 2012 - Perenco acquired the fields from BP |
Revision as of 07:10, 1 July 2024
Summary Information
- Operator: Perenco
- Country: UK
- Location: Southern North Sea
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The West Sole Alpha platform consists of steel legged platforms, which includes process facilities and accommodation and receives gas and fluids from all of the associated tie-backs.
- Processed gas and some fluids are routed to the onshore Dimlington Gas Terminal located on the Yorkshire coast via a 71.9 kilometre 16 inch diameter pipeline (PL28), through the West Sole Alpha platform through a 68 kilometre 24 inch diameter pipeline (PL145) and through the Amethyst A2D platform via a 47.7km 30 inch diameter pipeline (PL649).
- Hyde, Hoton and Amethyst are tied back to the West Sole Hub
Contractors
- -
History
- 1967 - Approval granted for development
- 1993 - Hyde Platform installed
- 2001 - Approval granted for Hoton
- 2012 - Perenco acquired the fields from BP